American Power Conversion AP9604S manual Product Specifications Monitoring Port Pin Assignments

Page 25

External Connection

4)Pack the APC Silcon Triple Chassis carefully in its original packaging, if possible. Do not use polystyrene beads for packing. Damage sustained in transit is not covered under the warranty. Enclose a letter in the package with your name, address, RMA number, a copy of the sales receipt, daytime phone number, and payment (if applicable).

5)Mark the RMA number clearly on the outside of the shipping carton. The factory will not accept any materials without this marking.

6)Return the Triple Chassis by insured, prepaid carrier to the address given to you by APC Customer Support.

4.7.6 Product Specifications

4.7.6.1 Monitoring Port Pin Assignments

The Monitoring port is a 9-pin communications port. The port operates with no flow control at a rate of 2400 baud. The data format is 8 data bits with 1 start bit, 1 stop bit, and no parity. When the Triple Chassis operates with simple signalling, the following limitations and capabilities apply to the Monitoring port:

Pins 3, 5, and 6 are open collector outputs which must be pulled up to a common referenced supply no greater than +40 VDC. The transistors are capable of a non- inductive load of 25 mA. Use only Pin 4 as the common.

The output at Pin 2 generates a low-to-high RS-232 level when the device is signalling an On Battery condition. The pin is normally at a low RS-232 level.

The UPS is signalled to shut down when a high RS-232 level is applied to Pin 1 for 4.5 seconds. Shutdown is also dependent on the UPS status.

When the Triple Chassis operates with advanced signalling, the following limitations and capabilities apply to the Monitoring port:

Pin 7 is unassigned.

DC operating voltage is available on Pin 8. This voltage may be from the UPS or from an external adapter, whichever is greater.

990-4056

Installation Guide APC Silcon 240-320kW 400V UPS

25

Image 25
Contents 240-320kW 400V UPS Installation Guide Safety Symbols used in this manual Installation Guide APC Silcon 240-320kW 400V UPSThank You Introduction IntroductionTools and Equipment ToolsUnpacking UnpackingInstallation InstallationRequirements on Site Height mm Width mm Depth mmFootprint 2 825mm Cabinet for Isolation Transformer or Switch Gear1 1600mm Cabinet for 240-320kW UPS 3 1600mm Cabinet for 320kW Isolation Transformer External Connection Connecting the UPSExternal Connection Right side viewInput Cable External External External PE MaximumFuses* FM OutputSystem Integration Interface Connections X005 Output Relays Terminal Blocks X003/X004 Anxiliary ContactsParallel Board Parallel BoardExternal Control Cables Power CablesRelays Relay BoardRelay Board/Relay Functions Relay Number Message Alarm-trigging EventsSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis APC Silcon Triple Chassis Safety WarningsProduct Description Monitoring PortInstalling Management Peripherals Optional Power InputLEDs If the LED is… Then the Silcon Triple Chassis…Order of Management Peripheral Cards Installing Management Peripheral CardsManagement Peripheral Priority Position Card Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA Problem Possible Cause Solution TroubleshootingIf Problems Persist Product Specifications Monitoring Port Pin Assignments External Connection Specification Power, Physical, and Environmental SpecificationsImportant Safety Instructions APC Silcon Battery CabinetsInstallation of Batteries Battery Breaker Box/Fuse-boxSilcon Battery Breaker Box APC Battery Breaker Box Connection Diagram 120-480kW Ampere Connection Max Dimensions Weight Rating CableHxWxD mm CircuitExternal Connection Programming Parameters Parameter Setting CommentsProgramming Parameters ParametersProgramming Keys Programming Example Switch to Bypass Operation System ConfigurationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Programming Parameters Programming Parameters for Advanced Parallel Operation Description of SettingsProgramming example Battery MonitorProgramming Parameters Options/Accessories Options/AccessoriesService Bypass Panel for Single Operation Options/Accessories Action On Service Bypass PanelDisplay shows Lamp indicationLamp indication On Servive Bypass Panel Switching from External Bypass to Normal UPS OperationService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories Options/Accessories Display shows H002a Lamp indication On Service Bypass Panel Following can be carried out on any UPS Switching Back to Normal Parallel/Redundant Operation Isolating One UPS for Service/MaintenanceIntersystem Synchronization Unit System ISU System Intersystem Synchronization UnitIntersystem Synchronization Unit ISU Extension of Remote Display Communication Distance Remote DisplayStandard Short-haul RS232 Modem Async Host DTE Remote Display DTE Connections Without ConverterConnections With Converter Pin Connections for cable from host to ME800A-R2 HostRemote Display Cables Remote Display Power SupplyRemote Display Setting Communication FaultAlarms Remote Display UseIsolation Transformer Height Width Depth WeightIsolation Example of Transformer Configuration Yyno PE Cable Connecting Isolation Transformer370kW 630 200 150Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories System Specifications System SpecificationsTechnical Data Dimensions / WeightWarranty WarrantyAPC Silcon Series Limited Factory Warranty Appendix Installation Planning DataAppendix Appendix How to Contact APC How to Contact APCAPC Corporate APC Denmark