Programming and Set-Up - Programming the UPS
Auto Boost Charge
To program the UPS for Auto Boost Charge, select
.
Browse through the menu, using the cursor
keys or until this message appears:
Select Auto Boost Charge by pressing .
Deactivate by pressing .
When the Auto Boost Charge function is selected, the system will automatically switch to Boost Charge Operation if the battery has been discharged.
The UPS will only stay in the Boost Charge operational mode for 8 hours. When the UPS is working in Auto Boost Charge operational mode, the charger is outside the battery current limitation. To change the Auto Boost Charge operating mode, contact APC. (The UPS can be programmed to stay in this mode up to 24 hrs).
Auto Boost Charge: OFF
64 | AIS 5000 400V Installation Manual |