APC MW II manual External Bypass Static Switch Wiring

Page 14

External Bypass Static Switch Wiring

Warning: Before you start the installation, verify that all AC and DC power source breakers are in the open position.

Warning: Use only manual reset protection as input over-current protection.

Warning: Over-current protection required by national wiring rules.

Warning: The UPS has no built-in disconnect devices to switch off external AC (Q1 and Q5) and DC (Q7 and Q8) input power. Ensure that the disconnect devices are available as separate components for this installation.

Caution: The External Bypass Static is not provided with built-in backfeed protection. Use suitable breakers with a minimum of 0.8 in/20 mm air gap and trip function. The breaker is controlled from the External Bypass SSW and will be tripped in case of backfeed.

Note: The installer must provide each external disconnect device for this UPS system with

labels displaying the following text: “Isolate the Uninterruptible Power Supply (UPS) as instructed in the User Guide before working on the circuit.”

Note: The installation of the External Bypass Static Switch must comply with local and national regulations.

Note: Run matched set of phase cables in the same cable run(s). Do not separate phases into different cable runs.

Note: Use only copper conductors.

10

Symmetra MW II 1200 kW 3 x 400/230 V Installation - 990-1979E-001

Image 14
Contents Installation Page Contents Specifications Symbols used in this guide Installation safetyPage Inverter Section UPS SectionsSerial number Control/Input/Output SectionExternal Bypass Static Switch Overview UPS Wiring PrinciplePower wiring External disconnection switches Input/Output wiring precautions  AC and PE cable connectionsBattery cables connection Hole distance AC BAT1 + BAT2 External Bypass Static Switch Wiring Top cable entry Maintenance Bypass Panel Communication cable overviewCommunication cables with optional Relay Board Relay BoardsLocation of relay boards Relay Function Mode Special Comments Relay board 1 connectionsRelay board 2 connections Page Electrical Specifications Low-Impedance/High-Impedance EarthingAC Input DC InputHeat dissipation AC OutputAC Input External Bypass SSW Input and upstream breakers Required Breaker Settings 400 V SystemsTorque specifications Output and downstream breakers Dual Mains Installation TN Systems CharacteristicsSystem and Protective Earthing Reference to IEC 60364-4-41Additional requirements for generating sets IEC 60364-5-55 Protective devices in TN systemsTT Systems Protective devices in TT systemsIT Systems Condition Protective devices in IT systemsSee IEC Legal in DK specialcases Symmetra MW Switchgear Service Entrance Earthing arrangements and protective conductors Grounding Page Page 990-1979E-001 2009