APC MW II manual UPS Wiring Principle, Power wiring, Overview

Page 9

Symmetra MW II 1200 kW 3 x 400/230 V Installation - 990-1979E-001

Maintenance Bypass Panel (MBP)

Symmetra MW

 

 

6

 

MAINS

Battery Breaker Box 1

Batteries 1

 

9

9

External Bypass Static Switch

Battery Breaker Box 2

Batteries 2

6

1.

MAINS SOURCE 3X400/230V TN-S (PROVIDED BY OTHERS).

8.

DC CABLING SHOULD BE SEGREGATED FROM AC CABLING

2.

Q1

- Q6 WITH 2NO/2NC AUXILIARY CONTACTS.

9.

SEE BATTERY INSTALLATION INFORMATION

3.

Q7,

Q8 DC RATED THERMAL MAGNETIC TRIP MOLDED CASE CIRCUIT BREAKER.

10.

POWER WIRING AND CONTROL WIRING MUST BE SEGREGATED.

 

WITH 24VOLT DC UNDER VOLTAGE RELEASE (UVR) AND 2NO/2NC AUXILIARY CONTACTS.

 

 

4.

ALL AC POWER CABLING IS L1,L2,L3,N,PE.

11.

AC CIRCUIT CABLE LENGTHS (INPUT AND OUTPUT) SHOULD BE EQUAL ON ALL MODULES

5.

UPS INPUT AND OUTPUT CONDUCTORS MUST BE IN SEPARATE CABLE RUNS.

12.

DC CIRCUIT CABLE LENGTHS SHOULD BE EQUAL ON ALL MODULES

6. UPS AND STATIC BYPASS WITHSTAND RATING, Icw = 200 KA

13.

= CABLING PROVIDED BY OTHERS

7. SEE THE INSTALLATION GUIDE FOR THE BREAKER SETTINGS OF Q1, Q3, Q4 AND Q5.

14.

INSTALLATION MUST COMPLY WITH NATIONAL AND LOCAL ELECTRICAL RULES.

 

Power wiring

Typical

See separate guide on parallel operation for wiring

overview

UPS Wiring Principle

overview in parallel systems.

 

 

Electrical Installation

5

Image 9
Contents Installation Page Contents Specifications Installation safety Symbols used in this guidePage Serial number UPS SectionsInverter Section Control/Input/Output SectionExternal Bypass Static Switch UPS Wiring Principle Power wiringOverview Input/Output wiring precautions External disconnection switchesAC and PE cable connections  Hole distance AC Battery cables connection BAT1 + BAT2 External Bypass Static Switch Wiring Top cable entry Communication cable overview Maintenance Bypass PanelRelay Boards Location of relay boardsCommunication cables with optional Relay Board Relay board 1 connections Relay Function Mode Special CommentsRelay board 2 connections Page Low-Impedance/High-Impedance Earthing Electrical SpecificationsDC Input AC InputAC Output AC Input External Bypass SSWHeat dissipation Required Breaker Settings 400 V Systems Torque specificationsInput and upstream breakers Output and downstream breakers Dual Mains Installation System and Protective Earthing CharacteristicsTN Systems Reference to IEC 60364-4-41Protective devices in TN systems Additional requirements for generating sets IEC 60364-5-55Protective devices in TT systems TT SystemsIT Systems Protective devices in IT systems ConditionSee IEC Legal in DK specialcases Symmetra MW Switchgear Service Entrance Earthing arrangements and protective conductors Grounding Page Page 2009 990-1979E-001