Symmetra MW II 1200 kW 3 × 400/230 V Installation -
Earthing arrangements and protective conductors - Symmetra MW inCTNinstallation-
See: IEC
This system configuration is not recommended
Switchgear |
|
|
|
|
|
|
|
Service Entrance |
|
|
|
|
| Q3 |
|
|
|
|
|
|
|
| |
Q5 |
|
|
| External |
| ||
Bypass - input |
|
|
|
| Bypass - output | Q6 | |
|
|
|
|
| |||
| L1 |
|
|
|
| L1 |
|
| L2 |
|
|
|
| L2 |
|
| L3 |
|
|
|
| L3 |
|
| Main Protective Earthing Terminal |
|
|
| |||
| PE |
|
|
|
| PE | Q4 |
|
|
|
|
|
|
| |
|
|
|
|
| SymmetraMW |
| |
Q1 | Mains - input |
| i | Delta |
| UPS - output |
|
|
|
| Inverter |
|
|
| |
| L1 |
|
| i |
| L1 |
|
|
|
|
|
|
|
| |
| L2 |
| i |
|
| L2 |
|
|
|
|
|
|
|
| |
| L3 |
|
|
|
| L3 |
|
|
|
|
|
| u | u |
|
| filter |
|
|
|
| M |
|
|
|
|
|
|
| ||
|
|
|
|
| u |
| |
|
|
|
|
|
| Main |
|
|
|
|
|
|
| inverter |
|
| N |
|
|
|
| N |
|
PEN | E |
|
|
|
|
|
|
PEN |
|
|
|
|
|
| |
| PEN |
|
|
| Main Protective Earthing Terminal | PEN | |
| PE |
|
|
|
| PE |
|
| + | - | + | - |
|
|
|
| 1 |
|
| 2 |
|
|
|
| Battery |
|
| Battery |
| The |
|
|
|
|
|
|
| system configuration. |
|
With reference to: |
|
|
|
IEC | Suitable earth electrode | Battery |
|
| with reference to IEC |
| |
|
| breaker |
|
|
| box Q7 | Q8 |
|
| PE |
|
|
| Battery |
|
|
| rack |
|
|
| Battery 1 | Battery 2 |
|
| PE |
|
( PDU )
N
PEN
PE
31