Contents
1.0 | Introduction | 5 |
1.1 | Tools and Equipment | 5 |
2.0 | Unpacking | 6 |
3.0 | Installation | 8 |
3.1 | Requirements on Site | 8 |
3.1.1 | Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table: | 8 |
3.2 | Footprint | 9 |
3.2.1 | 800mm Cabinet for | 9 |
4.0 | External Connection | 10 |
4.1 | Connecting the UPS | 10 |
4.2 | System Integration Interface | 12 |
4.2.1 | Connections | 13 |
4.3 | Parallel Board | 14 |
4.4 | Communication Interface Board | 17 |
4.4.1 | Connections | 17 |
4.5 | Connecting of APC Silcon Tripel Chassis | 18 |
4.6 | APC Silcon Triple Chassis | 19 |
4.6.1 | Safety Warnings | 19 |
4.6.2 | Product Description | 19 |
4.6.3 | Installing Management Peripherals | 20 |
4.6.4 | Powering the APC Silcon Triple Chassis | 22 |
4.6.5 | Troubleshooting | 23 |
4.6.6 | Product Specifications | 24 |
4.7 | APC Silcon Battery Cabinets | 27 |
4.7.1 | APC Silcon Battery Cabinets | 28 |
4.8 | Battery Breaker | 30 |
4.8.1 | Battery Breaker Box | 31 |
4.8.2 | Battery Breaker Box Connection Diagram | 32 |
4.8.3 | 33 | |
4.8.4 | 34 | |
4.8.5 | UPS with External Battery in Battery Breaker | 35 |
5.0 | Programming Parameters | 36 |
5.1 | Parameters | 36 |
5.1.1 | Programming Keys | 37 |
5.1.2 | Programming Example - Switch to Bypass Operation | 38 |
5.2 | System Configuration | 38 |
5.2.1 | Programming Example - Change Charge Voltage to 446 | 40 |
5.2.2 | Programming Example - Change to Output Isolation Transformer available | 41 |
5.3 | Programming Parameters for Advanced Parallel Operation | 42 |
5.3.1 | Description of Settings | 42 |
5.3.2 | Programming example | 43 |
5.4 | Battery Monitor | 43 |
5.4.1 | Installation of new batteries | 43 |
6.0 | Options/Accessories | 44 |
6.1 | Service Bypass Panel for Single Operation | 44 |
6.1.1 | Wiring up UPS with SBP in | 46 |
6.1.2 | Wiring up UPS with SBP in | 46 |
6.1.3 | Operating The External Service Bypass Switch | 47 |
6.2 | Service Bypass Panel for Parallel Redundant Operation | 49 |
6.2.1 | Two Parallel Systems with Service Bypass Panel | 50 |
6.2.2 | Parallel/Redundant Operation with Service Bypass Panel and External Battery |
|
| via MCCB | 51 |
6.2.3 | Operating External Service Bypass Switch for Parallel Systems | 52 |
6.2.4 | Isolating One UPS for Service/Maintenance | 56 |
6.2.5 | Switching Back to Normal Parallel/Redundant Operation | 57 |
6.3 | Intersystem Synchronization Unit | 58 |
6.4 | Relay Board | 59 |
|
| |
|
| |
Installation Guide APC Silcon | 3 |