APC 60-80kW manual 2.2Remote Display Power Supply, Remote Display Cables

Page 66

Options/Accessories

6.6.2Remote Display Installation 6.6.2.1Connecting RS232C and Mains Adapter

CAUTION!

Wiring for alarm and signal circuit field to be rated 300V (minimum).

Rear view

Rear view

Front view

1. Turn 180° to loosen the 4 screws

2. Remove front cover

3.

Mont back plate

Cable entry from bottom and rear

DP9-F

Mains adapter

 

 

 

4.

Connect cables

 

 

 

6.6.2.2Remote Display Power Supply

The remote display is supplied by normal AC power with no battery back-up. For UPS data transmission to remote display to remain unaffected during power failure, the remote display must be supplied from an uninterruptible power source.

Converters used to extend communication distance must also be supplied from uninterruptible power sources.

6.6.2.3 Remote Display Cables

RS232C to RS232C cable:

APC Silcon, DB25-F

Remote Display, DB9-M

X

Connect shield at one end only!

Rating: Refer to Local/National electrical codes.

Communication voltage +15VDC

990-4051

66

Installation Guide APC Silcon 60-80kW 400V UPS

Image 66
Contents 60-80kW 400V UPS Installation Guide Installation Guide APC Silcon 60-80kW 400V UPS Safety Symbols used in this manualThank You Contents 10.0 How to Contact APC System SpecificationsWarranty AppendixTools and Equipment IntroductionIntroduction ToolsUnpacking UnpackingPlease Recycle Installation InstallationRequirements on Site Footprint 1 800mm Cabinet for 60-80kW UPSConnecting the UPS External ConnectionExternal Connection 100 80kW Output CableFuses 125System Integration Interface Connections X005 Output Relays Parallel BoardTerminal Blocks X003/X004 Anxiliary Contacts Parallel BoardExternal Connection Power Cables External Control CablesCommunication Interface Board Connecting of APC Silcon Tripel Chassis Product Description Safety WarningsAPC Silcon Triple Chassis 2.1Monitoring Port2.3LEDs 2.4Optional Power InputInstalling Management Peripherals If the LED is… Then the Silcon Triple Chassis…Management Priority Position Peripheral Card 3.2Installing Management Peripheral Cards3.1Order of Management Peripheral Cards 3.3Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA Troubleshooting Problem Possible Cause Solution5.1If Problems Persist External Connection External Connection 6.2Power, Physical, and Environmental Specifications PhysicalEnvironmental APC Silcon Battery Cabinets Important Safety InstructionsAPC Silcon Battery Cabinets 1.1Installation of Batteries Diagram UPS with Battery CabinetSilcon Battery Breaker Box/Fuse-box Circuit Current kA 60 kW Battery Breaker BoxAmpere Connection Max Dimensions Weight Rating Cable Short 80 kWBattery Breaker Box Connection Diagram BatteryFuse-box 540x540x183 80 kW504x540x183 Fuse-box Connection Diagram External Connection Programming Parameters Parameter Setting CommentsProgramming Parameters ParametersProgramming Keys System Configuration Programming Example Switch to Bypass OperationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Change parameters by pressing Description of Settings Programming Parameters for Advanced Parallel OperationBattery Monitor Programming exampleOptions/Accessories Options/AccessoriesService Bypass Panel for Single Operation 10 x 0.75mm2 max mm2 Options/Accessories Operating The External Service Bypass Switch Display shows3.1Switching from External Bypass to Normal UPS Operation Lamp indication On Servive Bypass PanelService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories H002a Action Options/Accessories Lamp indication On Service Bypass Panel ActionDisplay shows Isolating One UPS for Service/Maintenance Following can be carried out on any UPSSwitching Back to Normal Parallel/Redundant Operation Intersystem Synchronization Unit Intersystem Synchronization Unit System ISU SystemIntersystem Synchronization Unit ISU Relay Board RelaysRelay Number Message Alarm-trigging Events Relay Board/Relay FunctionsSee .2 in this guide for System configuration Weight Equalizer Footprint 600mmFootprint 1000mm Cabinet Remote Display Extension of Remote Display Communication DistanceStandard Short-haul RS232 Modem Async 1.2Connections With Converter 1.1Connections Without ConverterHost DTE Remote Display DTE Pin Connections for cable from host to ME800A-R2 Host2.2Remote Display Power Supply Remote Display Cables3.6Alarms 3.2Communication FaultRemote Display Setting Remote Display UseMm wide Height mm Width mm Depth mm Weight kgIsolation Transformer 1400 600 800 625Isolation External Connecting Isolation TransformerCable mm2 Signal Cable Input Fuses Input Cable PE Cable Output Temp FM aOptions/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Technical Data System SpecificationsSystem Specifications Dimensions / WeightWarranty WarrantyAPC Silcon Series Limited Factory Warranty Installation Planning Data AppendixAppendix Appendix APC Corporate How to Contact APCHow to Contact APC APC Denmark