Installation
3.0Installation
3.1Requirements on Site
All system parts are accessible from front or top of UPS. Cable entries are accessible from bottom. A 1m free space on all sides should be allowed during installation. Once the system is installed it may be placed close to walls as long as free space is allowed for system doors to open. (Per applicable national and/or local codes.)
For ventilation and service purposes allow for free space of minimum 1m above the unit or per national and/or local codes and in front of UPS. Never install systems in direct sunlight.
NOTICE!
For reliability reasons do not stand on the UPS. keep the UPS cabinet surface free of any objects.
3.1.1 Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table:
* H is 1500 mm for optional IP31 cabinets
| Width | Width With | Width for Separate | |||
| Without |
| [mm] |
| Battery Cabinets | |
| Batteries |
|
|
| [mm] | |
| [mm] |
|
|
|
|
|
|
|
|
|
|
|
|
UPS |
| 1xBP I* | 2xBP I* | 3xBP I* | 1xBP II** | 1xBP III*** |
|
|
|
|
|
|
|
60kW | 800 |
|
|
| 1x800 | 1x1000 |
|
|
|
|
|
|
|
80kW | 800 |
|
|
| 1x800 | 1x1000 |
|
|
|
|
|
|
|
*BP I = Battery Pack I = 1 x 64 x 7 Ah batteries
**BP II = Battery Pack II = 1 x 64 x 24Ah batteries
***BP III = Battery Pack III = 1 x 64 x 38 Ah batteries
Cabinets |
|
|
|
|
|
|
| ||||
|
| 800 mm wide | 600 mm wide |
|
| 800 mm wide | |||||
|
|
|
| 1400 mm |
|
|
| 1400 mm |
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1000 mm wide
1400 mm
APC Isolation | Battery cabinet | Battery cabinet | |
| Transformer module | for 1xBP ll | for 1xBP lll |
|
|
| |
|
|
| |
|
| ||
8 | Installation Guide APC Silcon |