Toshiba instruction manual TOSLINE-S20, 3 B 0 3 6

Page 1

6 F 3 B 0 3 6 0

TOSLINE-S20

Active Star Coupler(ASC25)

Instruction Manual

REQUIREMENTS

Keep this instruction manual where it can be easily referred to by users and those responsible for the equipment.

Read this instruction manual carefully before using the equipment.

After this instruction manual has been read, keep it beside the equipment.

Sep

Image 1
Contents 3 B 0 3 6 TOSLINE-S20Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page Hardware External dimensionsProduct construction Component identification TX1 Function setting switchPage LED display PowerOptical connector Terminal block Fuse holder Power down method Start up and Power down methodsStart up method Page Precautions on using Active Star Coupler Page Method for mounting the main unit Installation and WiringRecommended mounting position Connection of optical fiber cables cords Method for connecting an Active Star Coupler with stationsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Edge position of F07 Type connector Precautions on handling optical fiber and optical connectorTosline S20 10 Removal of housing Method of F07optical connector assembly13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables