Toshiba S20 instruction manual Function setting switch, TX1

Page 16

TOSLINE-S20 Active Star Coupler (ASC25) Instruction Manual

6F3B0360

6.4Function setting switch

Arrangement and names of function setting switches are given below.

Figure 6.3

Name

Description

Use

TX1

Setting the function of preventive

Preventive measures to single-wire

measures to single-wire breaking

breaking

 

TX10

Setting the function of preventive

Preventive measures to single-wire

measures to single-wire breaking

breaking

 

OPTST

Setting the function for determining

Optical power determination

optical power

 

 

 

A.TST

Setting the function for automatic

Quality assurance test

testing

 

 

 

Table 6.2

(1)Setting switch "TX1"

Turn the switch to "ON" position, and the function of preventive measures to single-wire

breaking of CH1 is actuated. In the case that, when the function is in "ON" mode, the RX signal of CH1 cannot be detected during a period of about 400 ms, the transmission of TX signal from CH1 is stopped.

On the port which entered the stop transmission, when the switch is turned to "OFF" position after the circuit operation is resumed, the transmission is reactivated on receiving signals from other port. When the switch is turned to "ON" position again, the function is also reactivated.

When the function is in "OFF" mode, TX continues to transmit signals even if RX signal cannot be detected.

(2)Setting switch "TX10"

Turn the switch to "ON" position, and the function of preventive measures to single-wire

breaking of CH10 is actuated. In the case that, when the function is in "ON" mode, the RX signal of CH10 cannot be detected during a period of about 400 ms, the transmission of TX signal from CH10 is stopped.

TOSLINE S20

15

Image 16
Contents TOSLINE-S20 3 B 0 3 6Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page Hardware External dimensionsProduct construction Component identification Function setting switch TX1Page Power LED displayOptical connector Terminal block Fuse holder Power down method Start up and Power down methodsStart up method Page Precautions on using Active Star Coupler Page Installation and Wiring Method for mounting the main unitRecommended mounting position Method for connecting an Active Star Coupler with stations Connection of optical fiber cables cordsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Precautions on handling optical fiber and optical connector Edge position of F07 Type connectorTosline S20 Method of F07optical connector assembly 10 Removal of housing13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables