9.6Procedure of design for laying optical fiber cables

For the use of TOSLINE-S20 optical fiber cable system, following-listed items shall be observed to lay cables/codes.

(1)Precautions of optical fiber cable system design

(A)Formulation of FC Type optical level diagram

For FC Type, refer to the "T2/T3 stations instruction manual (6F3B0354)".

(B)Formulation of F07 Type optical fiber diagram

On designing an optical system, formulate the optical level diagram and confirm that the light power has sufficient margin in advance. The following is an example of transmission/receiving side level diagram. The example shows that the receiving side receives up to -29 dBm of light power. Nevertheless, the receiving side is designed to be capable of min. -25 dBm of light power taking into account of a margin. The level diagram given below does not consider the presence of aligner at intermediate position.

If an intermediate aligner exists, a corresponding light loss shall be added. Generally, that kind of loss is 2 dBm with an aligner. However, calculation shall be done after inquiry to the manufacturer, (use the worst case values.)

36

ASC25 Instruction Manual

Image 37
Contents 3 B 0 3 6 TOSLINE-S20Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page Hardware External dimensionsProduct construction Component identification TX1 Function setting switchPage LED display PowerOptical connector Terminal block Fuse holder Power down method Start up and Power down methodsStart up method Page Precautions on using Active Star Coupler Page Method for mounting the main unit Installation and WiringRecommended mounting position Connection of optical fiber cables cords Method for connecting an Active Star Coupler with stationsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Edge position of F07 Type connector Precautions on handling optical fiber and optical connectorTosline S20 10 Removal of housing Method of F07optical connector assembly13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables