Toshiba S20 instruction manual

Page 17

On the port which entered the stop transmission, when the switch is turned to "OFF" position after the circuit operation is resumed, the transmission is reactivated on receiving signals from other port. When the switch is turned to "ON" position again, the function is also reactivated.

When the function is in "OFF" mode, TX continues to transmit signals even if RX signal cannot be detected.

*For TX2 through TX9, the ASC25 side does not have the function because the preventive measures are provided to the connected device side.

(3)Setting switch "OPTST"

Turn the switch to "ON" position, and the output side of the whole optical modules is kept to illuminate continuously. Thus, the optical power can be determined. During the optical fiber cable laying work, check that the satisfaction of the level requirements at terminals of optical fiber cables, as needed, using the function. (Refer to page 30.)

Turn the switch to "OFF" position, and the mode returns to normal operation mode.

(4)Setting switch "A.TST"

The switch is a function switch used in the product inspection of Active Star Coupler before shipment.

When the Active Star Coupler is used, confirm that the switch is in "OFF" position. Although no mechanical failure occurs when the switch is in "ON" position, the apparatus

cannot be operated in normal state.

*

Inquiry relating to (4) is not accepted.

16

ASC25 Instruction Manual

Image 17
Contents 3 B 0 3 6 TOSLINE-S20Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page Product construction External dimensionsHardware Component identification TX1 Function setting switchPage LED display PowerOptical connector Terminal block Fuse holder Start up method Start up and Power down methodsPower down method Page Precautions on using Active Star Coupler Page Method for mounting the main unit Installation and WiringRecommended mounting position Connection of optical fiber cables cords Method for connecting an Active Star Coupler with stationsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Edge position of F07 Type connector Precautions on handling optical fiber and optical connectorTosline S20 10 Removal of housing Method of F07optical connector assembly13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables