Toshiba S20 instruction manual Method of F07optical connector assembly, Removal of housing

Page 33

9.5Method of F07optical connector assembly

Assembly work of optical connector shall conform to the following-given steps. For detail, refer to the instruction manual attached to the assembly tools.

Precautions of optical connector assembly work

On assembling an optical connector, observe the following-listed precautions.

Prepare exclusive-use assembling tools for processing optical connector.

A simple training is necessary for the understanding of the use of the exclusive-use assembling tools and for the

assembling method of optical connector. For detail, inquire to the cable manufacturer.

Recommended optical connector assembling tools

Manufacturer: Sumitomo Electric Industries, Ltd.

Agency: Takachiho Electric Co., Ltd.

Model of optical connector assembling tools: CAK-1062

(1)Cut off about 110 to 150 mm of the edge portion of the optical fiber cable using a cutter knife or other means, and inserts the optical fiber through the cord bush.

Optical fiber

110 to 150mm

Cord bush

Figure 9.9 Fiber cut off

(2)Using a jacket remover (use the hole at 2.2 side of label indication), remove the housing to about 45 mm in length. At that moment, the step between two housings shall be within 1 mm.

Housing

45±2mm

Figure 9.10 Removal of housing

32

ASC25 Instruction Manual

Image 33
Contents 3 B 0 3 6 TOSLINE-S20Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page External dimensions HardwareProduct construction Component identification TX1 Function setting switchPage LED display PowerOptical connector Terminal block Fuse holder Start up and Power down methods Power down methodStart up method Page Precautions on using Active Star Coupler Page Method for mounting the main unit Installation and WiringRecommended mounting position Connection of optical fiber cables cords Method for connecting an Active Star Coupler with stationsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Edge position of F07 Type connector Precautions on handling optical fiber and optical connectorTosline S20 10 Removal of housing Method of F07optical connector assembly13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables