Toshiba S20 instruction manual Plug-holding cap Spring

Page 36

TOSLINE-S20 Active Star Coupler (ASC25) Instruction Manual

6F3B0360

(9)Assemble the optical connector. On assembling the optical connector, care should be given not to mix the transmission side ferrule and the receiving side ferrule.

Plug-holding cap

Spring

Plug casing

 

Optical fiber

Cord bush

Projection

Hole

 

 

Figure 9.15 Optical connector assembly

(10)Confirm the quantity of light using a light power tester or other means

Recommended optical power meter

Manufacturer: Hactronics Co., Ltd.

Agency: Hakuto Co., Ltd.

 

 

photom 205

(light power meter)

Model:

photom 310-081CF

(light source unit)

 

photom 180-HTL

(F07 Type connector adapter)

TOSLINE S20

35

Image 36
Contents TOSLINE-S20 3 B 0 3 6Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page External dimensions HardwareProduct construction Component identification Function setting switch TX1Page Power LED displayOptical connector Terminal block Fuse holder Start up and Power down methods Power down methodStart up method Page Precautions on using Active Star Coupler Page Installation and Wiring Method for mounting the main unitRecommended mounting position Method for connecting an Active Star Coupler with stations Connection of optical fiber cables cordsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Precautions on handling optical fiber and optical connector Edge position of F07 Type connectorTosline S20 Method of F07optical connector assembly 10 Removal of housing13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables