Toshiba S20 instruction manual Precautions on laying cables

Page 40

TOSLINE-S20 Active Star Coupler (ASC25) Instruction Manual

6F3B0360

9.8Precautions on laying cables

For handling optical connectors and cords, refer to the "7.4 Precautions on handling optical fiber and connector" of the instruction manual.

(1)Precautions on laying cables

For the case of cable with connector, the front end cord and optical connector portions shall be carefully prepared not to apply direct force to the portions.

Cables shall be laid in straight pattern as far as possible.

(2)Check of transmission loss

To monitor the connection condition of aligner after wired and to detect abnormality in

transmission loss caused from contamination on the connector edge faces, light power shall be measured. The determination of the light power is done as follows.

Devices to be prepared

Light power meter 2 units (one shall have a reference light emission function) Reference single-core cord 2 cords (each having a length of about 1 meters)

(A)Check of light power meter

One of the two light power meters shall be used as the light source, and the two shall be connected as shown in the figure below, thus confirm the light emission power.

Light power meter (transmission side)

Light power meter (receiving side)

Reference single-core cord

Figure 9.17 Measurement of light emission power

Two reference cords shall be used to determine the light emission power.

Two cords for checking confirm that the reference cord is in normal state. Normally, both cords give similar results.

(B)Determination of transmission loss in actual optical transmission line

The above-described power meters shall be placed at both ends of the optical transmission line to determine the transmission loss. The difference between the value observed at that moment at receiving side and the value observed at receiving side with the reference cord becomes the transmission loss in actual transmission line.

Transmission loss in actual transmission line = (Observed value with the

reference cord) (Observed value in the transmission line)

TOSLINE S20

39

Image 40
Contents TOSLINE-S20 3 B 0 3 6Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page Hardware External dimensionsProduct construction Component identification Function setting switch TX1Page Power LED displayOptical connector Terminal block Fuse holder Power down method Start up and Power down methodsStart up method Page Precautions on using Active Star Coupler Page Installation and Wiring Method for mounting the main unitRecommended mounting position Method for connecting an Active Star Coupler with stations Connection of optical fiber cables cordsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Precautions on handling optical fiber and optical connector Edge position of F07 Type connectorTosline S20 Method of F07optical connector assembly 10 Removal of housing13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables