Toshiba S20 instruction manual Residual length of core cover

Page 34

TOSLINE-S20 Active Star Coupler (ASC25) Instruction Manual

6F3B0360

(3)Fold the tension member, and insert the collar through the jacket of optical fiber core wire until the collar went under the cord housing. The collar shall be exposed from the edge of housing removal by 1 mm or less.

Housing

Housing

Collar

Jacket

Collar

 

 

 

 

 

Jacket

Tension member

 

max. 1 mm

 

is divided to two

 

 

 

 

 

 

 

 

equal portions.

 

 

 

 

Figure 9.11 Collar insertion

Figure 9.12

Protrusion of collar

(4)Using the jacket remover (use the hole at 0.5 side of label indication), remove the cover (semi-transparent) of core wire of the optical fiber.

Housing

Core cover

Clad

max. 2 mm

Figure 9.13 Residual length of core cover

TOSLINE S20

33

Image 34
Contents TOSLINE-S20 3 B 0 3 6Table of Contents Precautions on ordering cables/cords Introduction Page Overview Page System Configurations Page Outline of Functions Page Specifications Page Hardware External dimensionsProduct construction Component identification Function setting switch TX1Page Power LED displayOptical connector Terminal block Fuse holder Power down method Start up and Power down methodsStart up method Page Precautions on using Active Star Coupler Page Installation and Wiring Method for mounting the main unitRecommended mounting position Method for connecting an Active Star Coupler with stations Connection of optical fiber cables cordsOptical parts DCV-HC-20/07 Optical connector CF-2001H Cord length Precautions on handling optical fiber and optical connector Edge position of F07 Type connectorTosline S20 Method of F07optical connector assembly 10 Removal of housing13 Residual length of core cover Page Plug-holding cap Spring Procedure of design for laying optical fiber cables Transmission side end Precautions on ordering cables/cords Precautions on laying cables