8e6 Technologies SL-002-002 Rack Mount Instructions for HL Servers, Rack Setup Suggestions

Page 11

Rack Mount Instructions for HL Servers

Rack Setup Suggestions

Determine the placement of each component in the rack before you install the rails.

Install the heaviest server components on the bottom of the rack first, and then work up.

Identify the Sections of the Rack Rails

You should have received two rack rail assemblies with the 8e6 server unit. Each of these assemblies consists of two sections: An inner fixed chassis rail that secures to the unit (A), and an outer fixed rack rail that secures directly to the rack itself (B). Two pairs of short brackets to be used on the front side of the outer rails are also included.

Install the Inner Rails

Both the left and right side inner rails have been pre-attached to the chassis. Proceed to the next step.

Install the Outer Rails

Begin by measuring the distance from the front rail to the rear rail of the rack. Attach a short bracket to the front side of the right outer rail and a long bracket to the rear side of the right outer rail. Adjust both the short and long brackets to the proper distance so that the rail can fiit snugly into the rack. Secure the short bracket to the front side of the outer rail with two M4 screws and the long bracket to the rear side of the outer rail with three M4 screws. Repeat these steps for the left outer rail.

8e6 Enterprise Reporter Quick Start Guide



Image 11
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Index Regulatory Specifications and DisclaimersAppendix Scsi Connected Storage Device ER Enterprise Reporter Introduction Conventions Used in this Document About this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsRack Mount Instructions for HL Servers Rack Setup SuggestionsInstall the Inner Rails Install the Outer Rails8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Rack Mount Instructions for SL Servers Install the Inner SlidesInstall the Outer Slides Install the Slide Assemblies to the Rack Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements Setup ProceduresQuick Start Setup Requirements Administrator Console Setup RequirementsSerial Console Setup Quick Start Setup ProceduresStorage Device Setup for Attached Storage Units Monitor and Keyboard SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Quick Start menu screen Login screenQuick Start menu administration menu Log Off, Disconnect the Peripherals System Status screenWorkstation Configurations Console Setup ProceduresPreliminary Setup Left Boot Up Process Log in to the Administrator Console Network SetupAccess the Internet Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting NTP Servers Regional Setting LanguagePhysically Connect the ER to the Network 8e6 menu LCD Panel Setup ProceduresLCD Menu LAN 1 Link Status Current Patch LevelDNS 1 GatewayHost Name Regional Setting Time Zone, date, timeShutdown Reset Admin Console PasswordReboot LCD Options menuLCD Controls HeartbeatBacklight Access the Internet Change User Name and Password, Set Self- MonitoringEnter a User Name and Password Change User Name and PasswordSet Self-Monitoring Enter the Master Administrator’s E-Mail AddressSelect 8e6 Enterprise Reporter, and then click Save R3000 ConfigurationClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window SL Unit LED Indicator KeyLED Indicator Color Condition Description HL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsModels HL-022-002, HL-002-002, SL-002-002 Safety ComplianceDeclaration of the Manufacturer or Importer Electromagnetic Compatibility EMCElectromagnetic Compatibility Class a Notice EC Declaration of Conformity Unpack the Unit from the Carton Preliminary Setup ProceduresOther Required Installation Items Rack Mount Components Rack Setup PrecautionsRack Mount the Server Step Step Step Link the ER Unit with the Scsi Connected Device Install the UnitRestart the Storage Device Unit Shut Down, Restart ProceduresShut Down the Storage Device Unit Physical Components LED Display Temperature and Ventilation StatusPower Supply Status Disk Drive Activity Management AlarmDisc Drive Alarm Silence ButtonIndex 8e6 Enterprise Reporter Quick Start Guide