8e6 Technologies SL-002-002 Rack Mount the Server, Rack Mount Components, Rack Setup Precautions

Page 65

Appendix: SAN Installation

Rack Mount the Server

Rack Mount Components

The following items are needed to install rails for rack mounting:

1 x Slide Kit and Mounting Hardware

1 pair Accuride Slide Rails

Rack Setup Precautions

Warning:

Before rack mounting the unit, the physical environment should be set up to safely ac- commodate the unit. Be sure that:

The weight of all units in the rack is evenly distributed. Hazardous conditions may be created by an uneven weight distribution.

The rack will not tip over when the unit is mounted, even when the unit is fully ex- tended from the rack.

For a single rack installation, stabilizers are attached to the rack.

For multiple rack installations, racks are coupled together.

The rack is grounded and will maintain a reliable ground at all times.

A power cord will be long enough to fit into the unit when properly mounted in the rack and will be able to supply power to the unit.

The connection of the unit to the power supply will not overload any circuits.

The unit is only connected to a properly rated supply circuit. Reliable earthing

(grounding) of rack-mounted equipment should be maintained.

The air flow through the unit’s fan or vents is not restricted.

The maximum operating ambient temperature does not exceed 104°F (40°C).

NOTE: Always make sure the rack is stable before extending a component from the rack.

WARNING: Extend only one component at a time. Extending two or more components simultaneously may cause the rack to become unstable.

8e6 Enterprise Reporter Quick Start Guide

61

Image 65
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Index Regulatory Specifications and DisclaimersAppendix Scsi Connected Storage Device ER Enterprise Reporter Introduction Conventions Used in this Document About this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsInstall the Inner Rails Rack Setup SuggestionsInstall the Outer Rails Rack Mount Instructions for HL Servers8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Rack Mount Instructions for SL Servers Install the Inner SlidesInstall the Outer Slides Install the Slide Assemblies to the Rack Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions Quick Start Setup Requirements Setup ProceduresAdministrator Console Setup Requirements LCD Panel Setup RequirementsStorage Device Setup for Attached Storage Units Quick Start Setup ProceduresMonitor and Keyboard Setup Serial Console SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Quick Start menu screen Login screenQuick Start menu administration menu Log Off, Disconnect the Peripherals System Status screenWorkstation Configurations Console Setup ProceduresPreliminary Setup Left Boot Up Process Log in to the Administrator Console Network SetupAccess the Internet Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting NTP Servers Regional Setting LanguagePhysically Connect the ER to the Network 8e6 menu LCD Panel Setup ProceduresLCD Menu LAN 1 Link Status Current Patch LevelDNS 1 GatewayHost Name Regional Setting Time Zone, date, timeReboot Reset Admin Console PasswordLCD Options menu ShutdownLCD Controls HeartbeatBacklight Access the Internet Change User Name and Password, Set Self- MonitoringEnter a User Name and Password Change User Name and PasswordSet Self-Monitoring Enter the Master Administrator’s E-Mail AddressSelect 8e6 Enterprise Reporter, and then click Save R3000 ConfigurationClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window SL Unit LED Indicator KeyLED Indicator Color Condition Description HL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsDeclaration of the Manufacturer or Importer Safety ComplianceElectromagnetic Compatibility EMC Models HL-022-002, HL-002-002, SL-002-002Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Unpack the Unit from the Carton Preliminary Setup ProceduresOther Required Installation Items Rack Mount Components Rack Setup PrecautionsRack Mount the Server Step Step Step Link the ER Unit with the Scsi Connected Device Install the UnitRestart the Storage Device Unit Shut Down, Restart ProceduresShut Down the Storage Device Unit Physical Components LED Display Temperature and Ventilation StatusPower Supply Status Disc Drive Alarm Management AlarmSilence Button Disk Drive ActivityIndex 8e6 Enterprise Reporter Quick Start Guide