8e6 Technologies HL-022-002, HL-002-002, SL-002-002 quick start Client Workstation Configuration

Page 51

Step 4: Client Workstation Configuration

Once your ER is installed, you need to be sure the workstation that will run the client has the following minimum requirements:

Pentium III class processor or greater

512 MB RAM minimum, 1 GB RAM recommended

1,024 x 768 display

2 GB free hard drive space

Windows 2000 or XP, or Macintosh OS X operating system

Internet Explorer Version 6.0 or later, Firefox 1.5, or Safari 2.0 Web browser

Pop-up blocking software disabled, if installed

High-speed connection to ER server

Go to the ER server and apply the latest software to the server, following the procedures documented in the Software Update screen sub-section of the ER Administrator User Guide. The CD-ROM supplied with the ER contains the ER Administrator User Guide, the latest version which can be downloaded from our Web site at: http://www.8e6.com/ docs/er4server.pdf.

NOTE: The CD-ROM supplied with the ER contains the ER Web Client User Guide, the latest version which can be downloaded from our Web site at: http:// www.8e6.com/docs/er4_wclient.pdf.

8e6 Enterprise Reporter Quick Start Guide

47

Image 51
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Regulatory Specifications and Disclaimers Appendix Scsi Connected Storage DeviceIndex ER Enterprise Reporter Introduction Conventions Used in this Document About this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsRack Mount Instructions for HL Servers Rack Setup SuggestionsInstall the Inner Rails Install the Outer Rails8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Inner Slides Install the Outer SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements Setup ProceduresQuick Start Setup Requirements Administrator Console Setup RequirementsSerial Console Setup Quick Start Setup ProceduresStorage Device Setup for Attached Storage Units Monitor and Keyboard SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Quick Start menu screen Login screenQuick Start menu administration menu Log Off, Disconnect the Peripherals System Status screenConsole Setup Procedures Preliminary SetupWorkstation Configurations Left Boot Up Process Network Setup Access the InternetLog in to the Administrator Console Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting NTP Servers Regional Setting LanguagePhysically Connect the ER to the Network LCD Panel Setup Procedures LCD Menu8e6 menu LAN 1 Link Status Current Patch LevelDNS 1 GatewayHost Name Regional Setting Time Zone, date, timeShutdown Reset Admin Console PasswordReboot LCD Options menuHeartbeat BacklightLCD Controls Access the Internet Change User Name and Password, Set Self- MonitoringEnter a User Name and Password Change User Name and PasswordSet Self-Monitoring Enter the Master Administrator’s E-Mail AddressSelect 8e6 Enterprise Reporter, and then click Save R3000 ConfigurationClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window LED Indicator Key LED Indicator Color Condition DescriptionSL Unit HL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsModels HL-022-002, HL-002-002, SL-002-002 Safety ComplianceDeclaration of the Manufacturer or Importer Electromagnetic Compatibility EMCElectromagnetic Compatibility Class a Notice EC Declaration of Conformity Preliminary Setup Procedures Other Required Installation ItemsUnpack the Unit from the Carton Rack Setup Precautions Rack Mount the ServerRack Mount Components Step Step Step Link the ER Unit with the Scsi Connected Device Install the UnitShut Down, Restart Procedures Shut Down the Storage Device UnitRestart the Storage Device Unit Physical Components Temperature and Ventilation Status Power Supply StatusLED Display Disk Drive Activity Management AlarmDisc Drive Alarm Silence ButtonIndex 8e6 Enterprise Reporter Quick Start Guide