8e6 Technologies HL-022-002, HL-002-002, SL-002-002 quick start EC Declaration of Conformity

Page 63

EC Declaration of Conformity

European Community Directives Requirement (CE)

Declaration of Conformity

Manufacturer’s Name:

8e6 Technologies

Manufacturer’s Address:

828 W. Taft Avenue

 

Orange, CA 92865

Application of Council Directive(s):

Low Voltage

• 2006/95/EC

 

EMC

• 2004/108/EC

Standard(s):

Safety

• EN60950: 2006

 

EMC

• EN55022: 2006

 

 

• EN55024: 1998 +A2:2003

 

 

EN61000-3-2: 2000

 

 

EN61000-3-3: 2001

Product Name(s):

Internet Appliance

Product Model Number(s):

HL-022-002, HL-002-002, SL-002-002

Year in which conformity is declared:

2008

 

 

All hardware components supplied in this unit’s

 

shipping carton are certified by our vendors to be

 

RoHS compliant.

I, the undersigned, hereby declare that the equipment specified above conforms to the above Directive(s) and Standard(s).

Location:

Orange, CA, USA

Signature:

 

Date:

January 21, 2008

Full Name:

Gregory P. Smith

 

 

Position:

Director of Engineering Operations

8e6 Enterprise Reporter Quick Start Guide

59

Image 63
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Regulatory Specifications and Disclaimers Appendix Scsi Connected Storage DeviceIndex ER Enterprise Reporter Introduction Conventions Used in this Document About this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsRack Mount Instructions for HL Servers Rack Setup SuggestionsInstall the Inner Rails Install the Outer Rails8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Inner Slides Install the Outer SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements Setup ProceduresQuick Start Setup Requirements Administrator Console Setup RequirementsSerial Console Setup Quick Start Setup ProceduresStorage Device Setup for Attached Storage Units Monitor and Keyboard SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Quick Start menu screen Login screenQuick Start menu administration menu Log Off, Disconnect the Peripherals System Status screenConsole Setup Procedures Preliminary SetupWorkstation Configurations Left Boot Up Process Network Setup Access the InternetLog in to the Administrator Console Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting NTP Servers Regional Setting LanguagePhysically Connect the ER to the Network LCD Panel Setup Procedures LCD Menu8e6 menu LAN 1 Link Status Current Patch LevelDNS 1 GatewayHost Name Regional Setting Time Zone, date, timeShutdown Reset Admin Console PasswordReboot LCD Options menuHeartbeat BacklightLCD Controls Access the Internet Change User Name and Password, Set Self- MonitoringEnter a User Name and Password Change User Name and PasswordSet Self-Monitoring Enter the Master Administrator’s E-Mail AddressSelect 8e6 Enterprise Reporter, and then click Save R3000 ConfigurationClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window LED Indicator Key LED Indicator Color Condition DescriptionSL Unit HL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsModels HL-022-002, HL-002-002, SL-002-002 Safety ComplianceDeclaration of the Manufacturer or Importer Electromagnetic Compatibility EMCElectromagnetic Compatibility Class a Notice EC Declaration of Conformity Preliminary Setup Procedures Other Required Installation ItemsUnpack the Unit from the Carton Rack Setup Precautions Rack Mount the ServerRack Mount Components Step Step Step Link the ER Unit with the Scsi Connected Device Install the UnitShut Down, Restart Procedures Shut Down the Storage Device UnitRestart the Storage Device Unit Physical Components Temperature and Ventilation Status Power Supply StatusLED Display Disk Drive Activity Management AlarmDisc Drive Alarm Silence ButtonIndex 8e6 Enterprise Reporter Quick Start Guide