Appendix: SAN Installation
Install the Unit
Link the ER Unit with the SCSI Connected Device
This step is a continuation from the Storage Device Setup (for Attached Storage Units) portion of Step 1A or 1B in the ER section. The procedures outlined in this step require the use of the
A.Plug the SCSI cable into the upper right slot on the back of the ER unit (see Figure 1, Item A).
B.Plug one end of the
Figure 1: Back of the ER unit
C.Plug the other end of the SCSI cable into the storage device’s upper left disk “0”
(zero) channel (see Figure 2, Item A).
Figure 2 - Back of the Nexsan SATABoy
D.Plug the other end of the
(zero) on the right (see Figure 2, Item B).
E.Plug the storage device’s AC power cords into the back of the unit (see Figure 2, Item C).
F.Plug the loose ends of the AC power cords into a power source with an appropriate rating. It is strongly suggested you use an uninterruptible power supply.
WARNING: Be sure all drives are installed in the storage device unit before powering on the unit. Be sure the ER unit is not powered on.
8e6 Enterprise Reporter Quick Start Guide | 65 |