8e6 Technologies HL-002-002 Shut Down, Restart Procedures, Shut Down the Storage Device Unit

Page 70

Appendix: SAN Installation

G.Turn on the power switches at the back of the storage device, which are positioned to the right of the power cord connectors.

The boot-up process may take up to 5 minutes. When the unit is booted up, the three vertical LED lights at the left of the front panel will be lit up (see Figure 3).

Once all LED lights are lit, the ER can be powered on.

Shut Down, Restart Procedures

Follow the procedures in this section if you need to shut down or restart the storage device.

Shut Down the Storage Device Unit

If you need to shut down the storage device, always follow these steps:

Figure 3: LED

display

A.Power off the ER unit first. (Refer to the Physically Connect the ER to the Network sub-step in Step 1B of the ER section for shut down procedures.)

B.Power off the storage device next by turning off both switches in the back of the unit.

Restart the Storage Device Unit

The storage device must be restarted after a power failure. In this instance, the storage device may already be turned on, but needs to be booted up again.

WARNING: You must always power on the storage device before powering on the ER unit. Since the storage device is an information database, if you experience a power interruption or if you power off the storage device without going through the standard shut down procedures, you may lose data and/or damage the file system.

To restart the storage device, press the power button on the front panel. The boot-up process may take up to 5 minutes.

66

8e6 Enterprise Reporter Quick Start Guide

Image 70
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Appendix Scsi Connected Storage Device Regulatory Specifications and DisclaimersIndex ER Enterprise Reporter Introduction About this Document Conventions Used in this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerInstall the Outer Rails Rack Setup SuggestionsInstall the Inner Rails Rack Mount Instructions for HL Servers8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Outer Slides Install the Inner SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Install the SL or HL Server Bezel Front of bezelCheck the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions Administrator Console Setup Requirements Setup ProceduresQuick Start Setup Requirements LCD Panel Setup RequirementsMonitor and Keyboard Setup Quick Start Setup ProceduresStorage Device Setup for Attached Storage Units Serial Console SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Login screen Quick Start menu screenQuick Start menu administration menu System Status screen Log Off, Disconnect the PeripheralsPreliminary Setup Console Setup ProceduresWorkstation Configurations Left Boot Up Process Access the Internet Network SetupLog in to the Administrator Console Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting Language Regional Setting NTP ServersPhysically Connect the ER to the Network LCD Menu LCD Panel Setup Procedures8e6 menu Current Patch Level LAN 1 Link StatusGateway DNS 1Regional Setting Time Zone, date, time Host NameLCD Options menu Reset Admin Console PasswordReboot ShutdownBacklight HeartbeatLCD Controls Change User Name and Password, Set Self- Monitoring Access the InternetChange User Name and Password Enter a User Name and PasswordEnter the Master Administrator’s E-Mail Address Set Self-MonitoringR3000 Configuration Select 8e6 Enterprise Reporter, and then click SaveClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window LED Indicator Color Condition Description LED Indicator KeySL Unit HL Unit Rear LED Indicators for Hardware Status Monitoring HL and SL Units RAIDElectromagnetic Compatibility EMC Safety ComplianceDeclaration of the Manufacturer or Importer Models HL-022-002, HL-002-002, SL-002-002Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Other Required Installation Items Preliminary Setup ProceduresUnpack the Unit from the Carton Rack Mount the Server Rack Setup PrecautionsRack Mount Components Step Step Step Install the Unit Link the ER Unit with the Scsi Connected DeviceShut Down the Storage Device Unit Shut Down, Restart ProceduresRestart the Storage Device Unit Physical Components Power Supply Status Temperature and Ventilation StatusLED Display Silence Button Management AlarmDisc Drive Alarm Disk Drive ActivityIndex 8e6 Enterprise Reporter Quick Start Guide