8e6 Technologies HL-002-002, HL-022-002, SL-002-002 quick start Boot Up Process

Page 34

D.Power on the ER by lowering the bezel and pressing the large button at the right of the front panel (see diagrams below):

Diagram of SL chassis front panel, power button at far right

Diagram of HL chassis front panel, power button at far right

WARNING: The ER is an information database. If you experience a power inter- ruption or power off the ER in any manner other than from the Web-based interface utility described in the sub-step Physically Connect the ER to the Network, you may lose data and/or damage the file system.

The Boot Up Process

The boot-up process may take 5 - 10 minutes. When the drive light remains off for 30 seconds, the system is booted up. (See the LED Indicators and Buttons section for a description of front panel LED indicators and buttons.)

If you wish to verify that the unit has been booted up, you can perform the following test on your workstation:

1.Go to your taskbar and click Start > Run.

2.In the dialog box, type in cmd (type in command if using Windows ME).

3.Click OK.

4.In the cmd.exe window, type in ping 1.2.3.4

5.Press Enter on your keyboard.

If you receive a reply, the unit is up.

30

8e6 Enterprise Reporter Quick Start Guide

Image 34
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Appendix Scsi Connected Storage Device Regulatory Specifications and DisclaimersIndex ER Enterprise Reporter Introduction About this Document Conventions Used in this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerInstall the Outer Rails Rack Setup SuggestionsInstall the Inner Rails Rack Mount Instructions for HL Servers8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Outer Slides Install the Inner SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Install the SL or HL Server Bezel Front of bezelCheck the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions Administrator Console Setup Requirements Setup ProceduresQuick Start Setup Requirements LCD Panel Setup RequirementsMonitor and Keyboard Setup Quick Start Setup ProceduresStorage Device Setup for Attached Storage Units Serial Console SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Login screen Quick Start menu screenQuick Start menu administration menu System Status screen Log Off, Disconnect the PeripheralsPreliminary Setup Console Setup ProceduresWorkstation Configurations Left Boot Up Process Access the Internet Network SetupLog in to the Administrator Console Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting Language Regional Setting NTP ServersPhysically Connect the ER to the Network LCD Menu LCD Panel Setup Procedures8e6 menu Current Patch Level LAN 1 Link StatusGateway DNS 1Regional Setting Time Zone, date, time Host NameLCD Options menu Reset Admin Console PasswordReboot ShutdownBacklight HeartbeatLCD Controls Change User Name and Password, Set Self- Monitoring Access the InternetChange User Name and Password Enter a User Name and PasswordEnter the Master Administrator’s E-Mail Address Set Self-MonitoringR3000 Configuration Select 8e6 Enterprise Reporter, and then click SaveClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window LED Indicator Color Condition Description LED Indicator KeySL Unit HL Unit Rear LED Indicators for Hardware Status Monitoring HL and SL Units RAIDElectromagnetic Compatibility EMC Safety ComplianceDeclaration of the Manufacturer or Importer Models HL-022-002, HL-002-002, SL-002-002Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Other Required Installation Items Preliminary Setup ProceduresUnpack the Unit from the Carton Rack Mount the Server Rack Setup PrecautionsRack Mount Components Step Step Step Install the Unit Link the ER Unit with the Scsi Connected DeviceShut Down the Storage Device Unit Shut Down, Restart ProceduresRestart the Storage Device Unit Physical Components Power Supply Status Temperature and Ventilation StatusLED Display Silence Button Management AlarmDisc Drive Alarm Disk Drive ActivityIndex 8e6 Enterprise Reporter Quick Start Guide