8e6 Technologies HL-002-002, HL-022-002, SL-002-002 quick start Step

Page 67

Appendix: SAN Installation

Step 3

Attach left and right rear (long) extended brackets to the outer rail using 2 screws, 2 washers, and 2 nuts for each bracket.

NOTE: Make sure the flange is on the bottom edge.

Step 4

Attach left and right front (short) extended brackets to the outer rail using 2 screws, 2 washers, and 2 nuts for each bracket.

NOTE: Make sure the flange is on the bottom edge.

8e6 Enterprise Reporter Quick Start Guide

63

Image 67
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Appendix Scsi Connected Storage Device Regulatory Specifications and DisclaimersIndex ER Enterprise Reporter Introduction Conventions Used in this Document About this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsRack Mount Instructions for HL Servers Rack Setup SuggestionsInstall the Inner Rails Install the Outer Rails8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Outer Slides Install the Inner SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements Setup ProceduresQuick Start Setup Requirements Administrator Console Setup RequirementsSerial Console Setup Quick Start Setup ProceduresStorage Device Setup for Attached Storage Units Monitor and Keyboard SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Quick Start menu screen Login screenQuick Start menu administration menu Log Off, Disconnect the Peripherals System Status screenPreliminary Setup Console Setup ProceduresWorkstation Configurations Left Boot Up Process Access the Internet Network SetupLog in to the Administrator Console Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting NTP Servers Regional Setting LanguagePhysically Connect the ER to the Network LCD Menu LCD Panel Setup Procedures8e6 menu LAN 1 Link Status Current Patch LevelDNS 1 GatewayHost Name Regional Setting Time Zone, date, timeShutdown Reset Admin Console PasswordReboot LCD Options menuBacklight HeartbeatLCD Controls Access the Internet Change User Name and Password, Set Self- MonitoringEnter a User Name and Password Change User Name and PasswordSet Self-Monitoring Enter the Master Administrator’s E-Mail AddressSelect 8e6 Enterprise Reporter, and then click Save R3000 ConfigurationClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window LED Indicator Color Condition Description LED Indicator KeySL Unit HL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsModels HL-022-002, HL-002-002, SL-002-002 Safety ComplianceDeclaration of the Manufacturer or Importer Electromagnetic Compatibility EMCElectromagnetic Compatibility Class a Notice EC Declaration of Conformity Other Required Installation Items Preliminary Setup ProceduresUnpack the Unit from the Carton Rack Mount the Server Rack Setup PrecautionsRack Mount Components Step Step Step Link the ER Unit with the Scsi Connected Device Install the UnitShut Down the Storage Device Unit Shut Down, Restart ProceduresRestart the Storage Device Unit Physical Components Power Supply Status Temperature and Ventilation StatusLED Display Disk Drive Activity Management AlarmDisc Drive Alarm Silence ButtonIndex 8e6 Enterprise Reporter Quick Start Guide