Install the Server
Step 1: Setup Procedures
This step requires you to link the workstation to the ER. You have the option of using the
Quick Start Setup Requirements
The following hardware can be used for the Quick Start setup procedures:
•ER with AC power cord
•either one of two options:
•PC monitor with AC power cord and keyboard, or
•PC laptop computer with HyperTerminal and serial port cable (and USB DB9 se- rial adapter, if there is no serial port on your laptop)
Go to Step 1A to execute Quick Start Setup Procedures.
Administrator Console Setup Requirements
The following hardware is required for the Administrator console setup procedures:
•ER with AC power cord
•
•PC laptop computer, or PC monitor with AC power cord and keyboard
Go to Step 1B to execute Console Setup Procedures.
LCD Panel Setup Requirements
The following hardware is required for LCD panel setup procedures:
•ER with AC power cord(s)
•Bezel with LCD panel mounted on chassis front
Go to Step 1C to execute LCD Panel Setup Procedures.
8e6 Enterprise Reporter Quick Start Guide | 19 |