8e6 Technologies SL-002-002, HL-022-002 Setup Procedures, Quick Start Setup Requirements

Page 23

Install the Server

Step 1: Setup Procedures

This step requires you to link the workstation to the ER. You have the option of using the text-based Quick Start setup procedures described in Step 1A, the Administrator console setup procedures described in Step 1B, or the LCD panel setup procedures described in Step 1C.

Quick Start Setup Requirements

The following hardware can be used for the Quick Start setup procedures:

ER with AC power cord

either one of two options:

PC monitor with AC power cord and keyboard, or

PC laptop computer with HyperTerminal and serial port cable (and USB DB9 se- rial adapter, if there is no serial port on your laptop)

Go to Step 1A to execute Quick Start Setup Procedures.

Administrator Console Setup Requirements

The following hardware is required for the Administrator console setup procedures:

ER with AC power cord

CAT-5E crossover cable

PC laptop computer, or PC monitor with AC power cord and keyboard

Go to Step 1B to execute Console Setup Procedures.

LCD Panel Setup Requirements

The following hardware is required for LCD panel setup procedures:

ER with AC power cord(s)

Bezel with LCD panel mounted on chassis front

Go to Step 1C to execute LCD Panel Setup Procedures.

8e6 Enterprise Reporter Quick Start Guide

19

Image 23
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Index Regulatory Specifications and DisclaimersAppendix Scsi Connected Storage Device ER Enterprise Reporter Introduction Conventions Used in this Document About this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsRack Mount Instructions for HL Servers Rack Setup SuggestionsInstall the Inner Rails Install the Outer Rails8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Rack Mount Instructions for SL Servers Install the Inner SlidesInstall the Outer Slides Install the Slide Assemblies to the Rack Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power Supply Server Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements Setup ProceduresQuick Start Setup Requirements Administrator Console Setup RequirementsSerial Console Setup Quick Start Setup ProceduresStorage Device Setup for Attached Storage Units Monitor and Keyboard SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Quick Start menu screen Login screenQuick Start menu administration menu Log Off, Disconnect the Peripherals System Status screenWorkstation Configurations Console Setup ProceduresPreliminary Setup Left Boot Up Process Log in to the Administrator Console Network SetupAccess the Internet Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting NTP Servers Regional Setting LanguagePhysically Connect the ER to the Network 8e6 menu LCD Panel Setup ProceduresLCD Menu LAN 1 Link Status Current Patch LevelDNS 1 GatewayHost Name Regional Setting Time Zone, date, timeShutdown Reset Admin Console PasswordReboot LCD Options menuLCD Controls HeartbeatBacklight Access the Internet Change User Name and Password, Set Self- MonitoringEnter a User Name and Password Change User Name and PasswordSet Self-Monitoring Enter the Master Administrator’s E-Mail AddressSelect 8e6 Enterprise Reporter, and then click Save R3000 ConfigurationClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window SL Unit LED Indicator KeyLED Indicator Color Condition Description HL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsModels HL-022-002, HL-002-002, SL-002-002 Safety ComplianceDeclaration of the Manufacturer or Importer Electromagnetic Compatibility EMCElectromagnetic Compatibility Class a Notice EC Declaration of Conformity Unpack the Unit from the Carton Preliminary Setup ProceduresOther Required Installation Items Rack Mount Components Rack Setup PrecautionsRack Mount the Server Step Step Step Link the ER Unit with the Scsi Connected Device Install the UnitRestart the Storage Device Unit Shut Down, Restart ProceduresShut Down the Storage Device Unit Physical Components LED Display Temperature and Ventilation StatusPower Supply Status Disk Drive Activity Management AlarmDisc Drive Alarm Silence ButtonIndex 8e6 Enterprise Reporter Quick Start Guide