8e6 Technologies HL-022-002 AC Power Cord and Cable Precautions, Electrical Safety Precautions

Page 21

Do not expose the server to rain or use near water. If liquids of any kind should leak into the chassis, power down the server, unplug it, and contact 8e6 Technologies technical support.

Disconnect power from the server before cleaning the unit. Do not use liquid or aero- sol cleaners.

AC Power Cord and Cable Precautions

Warning:

The AC power cord for the server must be plugged into a grounded, power outlet.

Do not modify or use a supplied AC power cord if it is not the exact type required in the region where the server will be installed and used. Replace the cord with the cor- rect type.

Route the AC power cord and cables away from moving parts and foot traffic.

Do not allow anything to rest on the AC power cord and cables.

Never use the server if the AC power cord has been damaged.

Always unplug the AC power cord before removing the unit for servicing.

Electrical Safety Precautions

Warning:

Heed the following safety precautions to protect yourself from harm and the server from damage:

CAUTION: Dangerous voltages associated with the 100-240 V AC power supply are present inside the unit. To avoid injury or electrical shock, do not touch exposed connections or components while the power is on.

To prevent damage to the server, read the information in this document for selection of the proper input voltage.

Do not wear rings or wristwatches when troubleshooting electrical circuits.

To avoid fire hazard, use only the specified fuse(s) with the correct type number, volt- age, and current ratings. Only qualified service personnel should replace fuses.

Qualified service personnel should be properly grounded when servicing the unit.

Qualified service personnel should perform a safety check after any service is per- formed.

8e6 Enterprise Reporter Quick Start Guide

17

Image 21
Contents Guide 8e6 Enterprise Reporter Quick Start Guide Contents Regulatory Specifications and Disclaimers Appendix Scsi Connected Storage DeviceIndex ER Enterprise Reporter Introduction Conventions Used in this Document About this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsInstall the Inner Rails Rack Setup SuggestionsInstall the Outer Rails Rack Mount Instructions for HL Servers8e6 Enterprise Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Inner Slides Install the Outer SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions Quick Start Setup Requirements Setup ProceduresAdministrator Console Setup Requirements LCD Panel Setup RequirementsStorage Device Setup for Attached Storage Units Quick Start Setup ProceduresMonitor and Keyboard Setup Serial Console SetupDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Enterprise Reporter Quick Start Guide 8e6 Enterprise Reporter Quick Start Guide Quick Start menu screen Login screenQuick Start menu administration menu Log Off, Disconnect the Peripherals System Status screenConsole Setup Procedures Preliminary SetupWorkstation Configurations Left Boot Up Process Network Setup Access the InternetLog in to the Administrator Console Network Settings 8e6 Enterprise Reporter Quick Start Guide Regional Setting Time Zone Regional Setting NTP Servers Regional Setting LanguagePhysically Connect the ER to the Network LCD Panel Setup Procedures LCD Menu8e6 menu LAN 1 Link Status Current Patch LevelDNS 1 GatewayHost Name Regional Setting Time Zone, date, timeReboot Reset Admin Console PasswordLCD Options menu ShutdownHeartbeat BacklightLCD Controls Access the Internet Change User Name and Password, Set Self- MonitoringEnter a User Name and Password Change User Name and PasswordSet Self-Monitoring Enter the Master Administrator’s E-Mail AddressSelect 8e6 Enterprise Reporter, and then click Save R3000 ConfigurationClient Workstation Configuration Launch the ER Client Enter the Password, and Confirm Password Conclusion Administrator Console, Expiration Screen ER Client, ER Server Statistics Window LED Indicator Key LED Indicator Color Condition DescriptionSL Unit HL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsDeclaration of the Manufacturer or Importer Safety ComplianceElectromagnetic Compatibility EMC Models HL-022-002, HL-002-002, SL-002-002Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Preliminary Setup Procedures Other Required Installation ItemsUnpack the Unit from the Carton Rack Setup Precautions Rack Mount the ServerRack Mount Components Step Step Step Link the ER Unit with the Scsi Connected Device Install the UnitShut Down, Restart Procedures Shut Down the Storage Device UnitRestart the Storage Device Unit Physical Components Temperature and Ventilation Status Power Supply StatusLED Display Disc Drive Alarm Management AlarmSilence Button Disk Drive ActivityIndex 8e6 Enterprise Reporter Quick Start Guide