Emerson RTM-ATCA-F120-OPT manual Hardware Preparation and Installation, Overview

Page 25

Chapter 2

Hardware Preparation and Installation

2.1Overview

This chapter describes all necessary steps you need to take in order to install the RTM-ATCA-

F120-OPT. The main steps are:

zInspect the shipment and unpack the RTM

zMake sure environmental and power requirements are met

zInstall the RTM

2.2Unpacking and Inspecting the RTM

Damage of Circuits

Electrostatic discharge and incorrect installation and removal of the blade can damage circuits or shorten their life.

Before touching the blade or electronic components, make sure that your are working in an ESD-safe environment.

To inspect the shipment, perform the following steps.

Shipment Inspection

1.Verify that you have received all items of your shipment: Printed user manual (Getting Started guide) RTM-ATCA-F120-OPT

RTM-ATCA-F120-OPT Installation and Use (6806800G29C)

25

Image 25
Contents RTM-ATCA-F120-OPT Contact Address Contents Contents List of Tables RTM-ATCA-F120-OPT Installation and Use 6806800G29CList of Tables List of Figures List of Figures About this Manual Overview of ContentsAbbreviations About this Manual ConventionsNotation Description BoldPart Number Publication Date Description Summary of ChangesAbout this Manual Electrical Interference Safety NotesSafety Notes InstallationOperation SFP/SFP+ Modules Environment Sicherheitshinweise Sicherheitshinweise EMVBeschädigung von Schaltkreisen Verletzungsgefahr UmweltschutzIntroduction FeaturesIntroduction Standard Description Standard CompliancesMechanical Data Feature ValueOrdering Information Overview Hardware Preparation and InstallationUnpacking and Inspecting the RTM Hardware Preparation and Installation Environmental and Power RequirementsEnvironmental Requirements Requirement Operating Non-Operating Power RequirementsInstalling the RTM Installing and Removing the RTMHardware Preparation and Installation Hardware Preparation and Installation Installation Procedure without Installed Front Blade Close the handles of the front blade Removing the RTM Removal ProcedureHardware Preparation and Installation Installing and Removing SFP/ SFP+ Modules Hardware Preparation and Installation Procedure Installing an SFP/SFP+ ModuleConnect the network cable to the SFP/SFP+ module Remove any connected cable from the SFP module Removing an SFP/SFP+ ModuleHardware Preparation and Installation Controls, LEDs and Connectors Controls, LEDs and Connectors LEDs and Interface ConnectorsDuring RTM installation Interface ConnectorsLEDs During RTM removalFabric Channel Uplinks Location of Ethernet Fabric Channel Uplink Interfaces Ethernet Type Face Plate Label2.1.2 1 GBit Fabric Interface Uplinks Base Channel Interface ConnectorsLocation of Base Interface Uplink Interface Connectors 2.2.1 10 GBit Base Interface Uplinks 2.3 SFP/SFP+ Module Hot Swap Location of Clock Extension Connectors Controls, LEDs and Connectors Telecom Clocking ConnectorsSerial Interface Connector Location of Serial Interface Connectors Pin Signal Functional Description Functional Description Block DiagramSensor Name Sensor Type Sensor Number Mezzanine Management ControllerRTM-F120-OPT MMC Functional Description Location of Ipmi Temperature Sensors Functional Description RTM-ATCA-F120-OPT Installation and Use 6806800G29C ARelated Documentation Emerson Network Power Embedded Computing DocumentsDocument Title and Source Publication Number Related Documentation Index Index Page Embedded Computing HOW to Reach Literature and Technical Support