Emerson RTM-ATCA-F120-OPT manual Hardware Preparation and Installation

Page 30

Hardware Preparation and Installation

9.Fully insert the RTM and lock it to the shelf by pressing the two components of the lower and the upper handles together and turning the handles toward the face plate.

If your shelf is powered, as soon as the RTM is connected to the front blade, the blue

LED is illuminated, and will remain illuminated until both the lower handle of the

RTM and the lower handle of the front blade are closed.

10.Close the lower handle of the front blade in order to power up the payload of both the front blade and the RTM.

The blue LEDs of both the front blade and the RTM start to flash. This indicates that the front blade is informing the shelf manager about its desire to power up the payload of both the front blade and the RTM.

11.Tighten both face plate screws on the RTM.

12.Wait until the blue LEDs of both the front blade and the RTM are OFF.

30

RTM-ATCA-F120-OPT Installation and Use (6806800G29C)

Image 30
Contents RTM-ATCA-F120-OPT Contact Address Contents Contents RTM-ATCA-F120-OPT Installation and Use 6806800G29C List of TablesList of Tables List of Figures List of Figures Overview of Contents About this ManualAbbreviations Notation Description ConventionsAbout this Manual BoldSummary of Changes Part Number Publication Date DescriptionAbout this Manual Safety Notes Electrical InterferenceInstallation Safety NotesOperation SFP/SFP+ Modules Environment Sicherheitshinweise EMV SicherheitshinweiseBeschädigung von Schaltkreisen Umweltschutz VerletzungsgefahrFeatures IntroductionIntroduction Standard Compliances Standard DescriptionFeature Value Mechanical DataOrdering Information Hardware Preparation and Installation OverviewUnpacking and Inspecting the RTM Environmental and Power Requirements Hardware Preparation and InstallationEnvironmental Requirements Power Requirements Requirement Operating Non-OperatingInstalling and Removing the RTM Installing the RTMHardware Preparation and Installation Hardware Preparation and Installation Installation Procedure without Installed Front Blade Close the handles of the front blade Removal Procedure Removing the RTMHardware Preparation and Installation Installing and Removing SFP/ SFP+ Modules Hardware Preparation and Installation Installing an SFP/SFP+ Module ProcedureConnect the network cable to the SFP/SFP+ module Removing an SFP/SFP+ Module Remove any connected cable from the SFP moduleHardware Preparation and Installation Controls, LEDs and Connectors LEDs and Interface Connectors Controls, LEDs and ConnectorsLEDs Interface ConnectorsDuring RTM installation During RTM removalFabric Channel Uplinks Location of Ethernet Fabric Channel Uplink Interfaces Face Plate Label Ethernet TypeBase Channel Interface Connectors 2.1.2 1 GBit Fabric Interface UplinksLocation of Base Interface Uplink Interface Connectors 2.2.1 10 GBit Base Interface Uplinks 2.3 SFP/SFP+ Module Hot Swap Controls, LEDs and Connectors Telecom Clocking Connectors Location of Clock Extension ConnectorsSerial Interface Connector Location of Serial Interface Connectors Pin Signal Functional Description Block Diagram Functional DescriptionMezzanine Management Controller Sensor Name Sensor Type Sensor NumberRTM-F120-OPT MMC Functional Description Location of Ipmi Temperature Sensors Functional Description RTM-ATCA-F120-OPT Installation and Use 6806800G29C Emerson Network Power Embedded Computing Documents ARelated DocumentationDocument Title and Source Publication Number Related Documentation Index Index Page HOW to Reach Literature and Technical Support Embedded Computing