Emerson RTM-ATCA-F120-OPT manual Installation Procedure without Installed Front Blade

Page 31

Hardware Preparation and Installation

A switched OFF blue LED indicates that the payload of the respective blade or RTM has been powered up and is active.

13.Plug interface cable into face plate connectors, if applicable.

Installation Procedure without Installed Front Blade

The following procedure describes the installation of the RTM.

1.Locate the slot the RTM is to be installed into the shelf's rear which must be the same as that of the front blade.

2.Ensure that the top and the bottom handles of the RTM are in an outward position by squeezing the lever and the latch together.

3.Insert the RTM into the shelf by placing the top and bottom edges in the card guides of the slot.

4.Slide the RTM into the slot.

5.Apply equal and steady pressure to the RTM to carefully slide the RTM into the shelf until you feel resistance. Continue to gently push the RTM until the RTM connectors engage.

RTM-ATCA-F120-OPT Installation and Use (6806800G29C)

31

Image 31
Contents RTM-ATCA-F120-OPT Contact Address Contents Contents List of Tables RTM-ATCA-F120-OPT Installation and Use 6806800G29CList of Tables List of Figures List of Figures About this Manual Overview of ContentsAbbreviations Bold ConventionsAbout this Manual Notation DescriptionPart Number Publication Date Description Summary of ChangesAbout this Manual Electrical Interference Safety NotesSafety Notes InstallationOperation SFP/SFP+ Modules Environment Sicherheitshinweise Sicherheitshinweise EMVBeschädigung von Schaltkreisen Verletzungsgefahr UmweltschutzIntroduction FeaturesIntroduction Standard Description Standard CompliancesMechanical Data Feature ValueOrdering Information Overview Hardware Preparation and InstallationUnpacking and Inspecting the RTM Hardware Preparation and Installation Environmental and Power RequirementsEnvironmental Requirements Requirement Operating Non-Operating Power RequirementsInstalling the RTM Installing and Removing the RTMHardware Preparation and Installation Hardware Preparation and Installation Installation Procedure without Installed Front Blade Close the handles of the front blade Removing the RTM Removal ProcedureHardware Preparation and Installation Installing and Removing SFP/ SFP+ Modules Hardware Preparation and Installation Procedure Installing an SFP/SFP+ ModuleConnect the network cable to the SFP/SFP+ module Remove any connected cable from the SFP module Removing an SFP/SFP+ ModuleHardware Preparation and Installation Controls, LEDs and Connectors Controls, LEDs and Connectors LEDs and Interface ConnectorsDuring RTM removal Interface ConnectorsDuring RTM installation LEDsFabric Channel Uplinks Location of Ethernet Fabric Channel Uplink Interfaces Ethernet Type Face Plate Label2.1.2 1 GBit Fabric Interface Uplinks Base Channel Interface ConnectorsLocation of Base Interface Uplink Interface Connectors 2.2.1 10 GBit Base Interface Uplinks 2.3 SFP/SFP+ Module Hot Swap Location of Clock Extension Connectors Controls, LEDs and Connectors Telecom Clocking ConnectorsSerial Interface Connector Location of Serial Interface Connectors Pin Signal Functional Description Functional Description Block DiagramSensor Name Sensor Type Sensor Number Mezzanine Management ControllerRTM-F120-OPT MMC Functional Description Location of Ipmi Temperature Sensors Functional Description RTM-ATCA-F120-OPT Installation and Use 6806800G29C ARelated Documentation Emerson Network Power Embedded Computing DocumentsDocument Title and Source Publication Number Related Documentation Index Index Page Embedded Computing HOW to Reach Literature and Technical Support