Emerson RTM-ATCA-F120-OPT manual Hardware Preparation and Installation

Page 34

Hardware Preparation and Installation

1.Unlatch the lower handle outward by squeezing the lever and the latch together and turning the handle outward only enough to unlatch the handle from the face plate, that means until you feel a resistance. Do not rotate the handle fully outwards.

The blue LED blinks indicating that the shelf manager is informed about the desire of the blade to power down the payload of both the front blade and the RTM and the power-down process is ongoing.

Data Loss

Removing the RTM with the system power on and the blue LED on the front blade still flashing causes data loss.

Before removing the RTM from a powered system, power down the slot by opening the lower handle of the front blade and wait until the blue LED is permanently ON.

2.Wait until the blue LEDs on both the front blade and the RTM are permanently ON. A permanently switched ON LED indicates that the payload of respective blade or RTM has been powered down.

34

RTM-ATCA-F120-OPT Installation and Use (6806800G29C)

Image 34
Contents RTM-ATCA-F120-OPT Contact Address Contents Contents RTM-ATCA-F120-OPT Installation and Use 6806800G29C List of TablesList of Tables List of Figures List of Figures About this Manual Overview of ContentsAbbreviations Notation Description ConventionsAbout this Manual BoldSummary of Changes Part Number Publication Date DescriptionAbout this Manual Safety Notes Electrical InterferenceSafety Notes InstallationOperation SFP/SFP+ Modules Environment Sicherheitshinweise EMV SicherheitshinweiseBeschädigung von Schaltkreisen Umweltschutz VerletzungsgefahrFeatures IntroductionIntroduction Standard Compliances Standard DescriptionMechanical Data Feature ValueOrdering Information Overview Hardware Preparation and InstallationUnpacking and Inspecting the RTM Hardware Preparation and Installation Environmental and Power RequirementsEnvironmental Requirements Power Requirements Requirement Operating Non-OperatingInstalling and Removing the RTM Installing the RTMHardware Preparation and Installation Hardware Preparation and Installation Installation Procedure without Installed Front Blade Close the handles of the front blade Removal Procedure Removing the RTMHardware Preparation and Installation Installing and Removing SFP/ SFP+ Modules Hardware Preparation and Installation Installing an SFP/SFP+ Module ProcedureConnect the network cable to the SFP/SFP+ module Removing an SFP/SFP+ Module Remove any connected cable from the SFP moduleHardware Preparation and Installation Controls, LEDs and Connectors LEDs and Interface Connectors Controls, LEDs and ConnectorsLEDs Interface ConnectorsDuring RTM installation During RTM removalFabric Channel Uplinks Location of Ethernet Fabric Channel Uplink Interfaces Face Plate Label Ethernet TypeBase Channel Interface Connectors 2.1.2 1 GBit Fabric Interface UplinksLocation of Base Interface Uplink Interface Connectors 2.2.1 10 GBit Base Interface Uplinks 2.3 SFP/SFP+ Module Hot Swap Controls, LEDs and Connectors Telecom Clocking Connectors Location of Clock Extension ConnectorsSerial Interface Connector Location of Serial Interface Connectors Pin Signal Functional Description Block Diagram Functional DescriptionMezzanine Management Controller Sensor Name Sensor Type Sensor NumberRTM-F120-OPT MMC Functional Description Location of Ipmi Temperature Sensors Functional Description RTM-ATCA-F120-OPT Installation and Use 6806800G29C ARelated Documentation Emerson Network Power Embedded Computing DocumentsDocument Title and Source Publication Number Related Documentation Index Index Page HOW to Reach Literature and Technical Support Embedded Computing