Runco operation manual Mounting the LS-3/LS-5

Page 39

Installation

There are several methods for mounting the projector. Depending on your chosen installation, one method may be more suitable than another.

In typical front and rear screen installations, the projector can be mounted to a secure and level surface such as a table or cart. Carts are useful when moving a projector during a presentation or from site to site. If possible, lock the wheels when it’s in position to prevent it from being moved during a presentation.

3.5 Mounting the LS-3/LS-5

Floor Mounting (Upright)

For fixed installations, and for those that want the projector out of sight or have a limited

Ceiling Mounting

space for projector and audience, you can invert the LS-3/LS-5 and suspend it from the

(Inverted)

ceiling using a specially-designed ceiling mount fixture.

 

For ceiling installations, use Runco-approved mounting hardware

Note and M4 screws with a maximum screw depth of 10 mm (0.39 inch).

Install the mount kit according to the instructions provided with it.

If the screen is significantly higher or lower than the projector, you can also tilt the

Adjusting the Projection

projector at a slight angle. In a ceiling installation, you do this by adjusting the ceiling

Angle

mount.

 

For a floor installation, turn the adjustable feet at the bottom of the projector to adjust the

 

projection angle.

 

If you do this, you may need to vertically shift the image to compensate. For detailed

 

instructions, refer to Lens Adjustments on page 31.

 

Runco LS-3/LS-5 Installation/Operation Manual

23

Image 39
Contents LS-3 LS-3/CineWide LS-5 LS-5/CineWide LS-3 Series LS-5 SeriesPage RuncoCare Standard Features RuncoCare Standard Two Year Limited WarrantyRuncoCare Claim Procedure Page Copyright and Trademarks Important Safety Instructions Declaration of Conformity Compliance InformationFCC Part Page Table of Contents Operation Maintenance and TroubleshootingSerial Communications SpecificationsTable of Contents Xiv List of Figures List of Figures Xvi About This Manual IntroductionIf you need Turn to Using This ManualDescription, Features and Benefits Additional Features of the LS-5 LS-3/LS-5 at a Glance Controls and FunctionsSource LS-3/LS-5 Rear/Bottom/Top View Runco Logo Badge Page Page Projector on LS-3/LS-5 Remote ControlPIP Installation Remote ControlOperation IR Reception Angles For Details, Refer Quick SetupInstallation Overview Step ProcedureConsiderations InstallationProjector Installation Options Installation TypeThrow Distance Ambient LightThrow Ratios for the LS-3/LS-5 Series Vertical and HorizontalPosition Lens Shift Horizontal Lens Shift Example Only Installing the Optional CineWide Lens Mount Folded OpticsOther Considerations Installing the Fixed CineWide Base PlateDo not use the mounting screws provided with the ceiling Mounting the LS-3/LS-5 Connector Panel Access Connections toLS-3/LS-5 HDMI/DVI Connections See Figure Connecting Source Components to the LS-3/LS-5RGB Connections Page 11. Composite and S-Video Connections Connection RS-232 ControllerTheater Equipment Connecting 12-VoltConnecting an External IR Trigger Output to ExternalZoom Out Focus Zoom Turning on the Power Lens AdjustmentsConnecting to AC Power Focus and Zoom Lens ShiftInstallation Rear Projection Ceiling Mode Changing the OSD Language Adjusting the Picture OrientationIt is extremely important that the primary lens is properly Installing and Adjusting the CineWide Anamorphic LensAdjusting the Lens Height and Angle Correct Lens Angle Incorrect Lens Angle Selecting An Input Source OperationSelecting Video Memory Selecting an Aspect RatioMain Using Picture-In-Picture PIPAvailable Main and PIP Source Combinations PIP Input SourceUsing the On-Screen Menus LS-3/LS-5 OSD Menu Structure LS-3/LS-5 Main Menu Main169 Aspect Ratio SettingsNarrow 169Native You must enter a passcode to access the Save ISF Typical Pluge Pattern for Adjusting Brightness Typical Test Pattern for Adjusting Sharpness Operation Overscan Examples Source Select Sub-Menu LS-3/LS-5 Advanced Menu AdvancedOperation Color X/y Color Gamut ValuesRGB Adjust Sub-Menu 10. Fine Sync Sub-Menu Operation 11. LS-3/LS-5 System Menu System12. Source Enable Sub-Menu PBP1 PBP2 14. PIP Split-Screen Mode Control Page Language 15. LS-3/LS-5 Service Menu OSD menus are not available when in test pattern mode Operation Lamp Replacement Maintenance and TroubleshootingTroubleshooting Tips Troubleshooting ChartSymptom Possible Causes Solution Troubleshooting Chart Maintenance and Troubleshooting Serial Communications Key CommandsRS232 Remote Button IR Code Description Keyname Set Serial Command Key Names and IR CodesGam.crt Lit.tog Operations Control Commands Function Action on unitOperation Commands Values Serial CommandsSave.mem Source.sel = ? Satco = ? Auto.pow.off = ? Act.source Status Error Code LED Indication Description RS-232 Error CodesPage LS-3/LS-5 Specifications Universal Power Supply DimensionsWeight without lens Operating Temperature1shows the LS-3/LS-5 dimensions, in millimeters LS-3/LS-5 DimensionsSupported Timings Supported Signal Timings by InputPAL-B/G