Enterasys Networks 5H103-48, 5H102-48 manual Quantity

Page 26

Unpacking the Module

1.Open the box and remove the packing material protecting the module.

2.Verify the contents of the carton as listed in Table 3-1.

Table 3-1Contents of Module Carton

Item

Quantity

 

 

One module, either the 5H102-48 or the 5H103-48

1

 

 

Antistatic Wrist Strap

1

 

 

RJ21 Angle Adapter

4

 

 

Manual Accessory Kit

1

 

 

3.Remove the tape seal on the non-conductive bag to remove the module.

4.Perform a visual inspection of the module for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to Getting Help for details.

3-2Installation

Image 26
Contents 5H102-48 and 5H103-48 Fast Ethernet Installation Guide Page Page Vcci Notice FCC NoticeIndustry Canada Notice Enterasys NETWORKS, INC Program License Agreement IiiPage Declaration of Conformity Page Contents Troubleshooting Figures Tables Structure of this Guide Using this GuideAbout This Guide Related Documents Document Conventions Guide uses the following conventionsGetting Help Your email addressIntroduction Introduction5H102-48 and 5H103-48 Modules Port Trunking ConnectivityHALF-DUPLEX/FULL-DUPLEX AUTO-NEGOTIATION Remote Monitoring Rmon802.1 Port Priority PORT/VLAN Redirect FunctionFlow Control ManagementSwitching Options Standards CompatibilityPage 10BASE-T Network Port Trunking FeatureNetwork Requirements 100BASE-TX Network Installation Unpacking the ModuleQuantity Installing the Module Into the 5C105 Chassis Installing a Module into the 5C105 Chassis Connecting to the Network Connecting UTP Cables to the 5H102-48Connecting a Twisted Pair Segment to the 5H102-48 Crossover Cable RJ45 Pinouts Connecting UTP Cables to the 5H103-48 Connection Using the RJ21 Angle Adapter Completing the Installation Troubleshooting Using LanviewLanview LEDs both modules CPU Is enabled and there is a Troubleshooting Checklist OFFLocal Management User’s Guide for the IP Using the Reset Button Reset Button both modulesPage Physical Properties SpecificationsModule Specifications Environmental RequirementsINPUT/OUTPUT Ports COM Port Pinout AssignmentsRegulatory Compliance Page Mode Switch Bank Settings and Options Required ToolsSetting the Mode Switches Figure B-1 Mode Switch LocationSetting the Mode Switches Page Index NumericsIndex-2