Enterasys Networks 5H102-48, 5H103-48 manual Cpu

Page 37

 

 

 

Using LANVIEW

 

 

 

 

Table 4-1 LANVIEW LEDs

 

 

 

 

 

LED

Color

State

Recommended Action

 

 

 

 

CPU

Off

Power off.

Ensure chassis has adequate power.

 

 

 

 

 

Red

Solid. Hardware failure

If the LED remains red for several

 

 

has occurred.

minutes, contact Enterasys Networks for

 

 

 

technical support.

 

 

 

 

 

Amber

Blinking. Image is being

None.

 

 

loaded from Flash.

 

 

 

 

 

 

 

Solid. Boot PROM

If the LED remains amber for more than

 

 

diagnostics are running.

several minutes, contact Enterasys

 

 

 

Networks for technical support.

 

 

 

 

 

Green

Solid. Unit is functional.

None.

 

 

 

 

 

Amber

Booting. Blinks amber

None.

 

and

and green while image is

 

 

Green

loading.

 

 

 

 

 

RX

Off

No link. No activity or

None.

(Receive)

 

port in standby. Port

 

 

 

enabled or disabled.

 

 

 

 

 

 

Green

Solid. Link, port enabled,

None.

 

 

no activity.

 

 

 

 

 

 

 

Blinking. Link, port

None.

 

 

disabled.

 

 

 

 

 

 

Amber

Flashing. Link, port

None.

 

 

enabled, activity.

 

 

 

 

 

 

Red

Solid. Diagnostic failure.

Contact Enterasys Networks for

 

 

 

assistance.

 

 

 

 

Troubleshooting 4-3

Image 37
Contents 5H102-48 and 5H103-48 Fast Ethernet Installation Guide Page Page Industry Canada Notice FCC NoticeVcci Notice Iii Enterasys NETWORKS, INC Program License AgreementPage Declaration of Conformity Page Contents Troubleshooting Figures Tables About This Guide Using this GuideStructure of this Guide Related Documents Guide uses the following conventions Document ConventionsYour email address Getting HelpIntroduction Introduction5H102-48 and 5H103-48 Modules HALF-DUPLEX/FULL-DUPLEX AUTO-NEGOTIATION ConnectivityPort Trunking Remote Monitoring RmonFlow Control PORT/VLAN Redirect Function802.1 Port Priority ManagementStandards Compatibility Switching OptionsPage Network Requirements Port Trunking Feature10BASE-T Network 100BASE-TX Network Unpacking the Module InstallationQuantity Installing the Module Into the 5C105 Chassis Installing a Module into the 5C105 Chassis Connecting UTP Cables to the 5H102-48 Connecting to the NetworkConnecting a Twisted Pair Segment to the 5H102-48 Crossover Cable RJ45 Pinouts Connecting UTP Cables to the 5H103-48 Connection Using the RJ21 Angle Adapter Completing the Installation Using Lanview TroubleshootingLanview LEDs both modules CPU Is enabled and there is a OFF Troubleshooting ChecklistLocal Management User’s Guide for the IP Reset Button both modules Using the Reset ButtonPage Module Specifications SpecificationsPhysical Properties Environmental RequirementsCOM Port Pinout Assignments INPUT/OUTPUT PortsRegulatory Compliance Page Required Tools Mode Switch Bank Settings and OptionsFigure B-1 Mode Switch Location Setting the Mode SwitchesSetting the Mode Switches Page Numerics IndexIndex-2