Completing the Installation
3.Tighten the two screws on the RJ21 connector, as applicable, to secure it to the module.
If using the RJ21 angle adapter, plug in the RJ21
NOTE: The cable pinouts for a
4.Verify that a link exists by checking that the port Link LEDs are on (flashing amber, blinking green, or solid green). If any of the Link LEDs are off, perform the following steps until they are on:
a.Verify that the device at the other end of the twisted pair segment is ON and connected to the segment.
b.Verify that the RJ21 connectors on the twisted pair segment have the proper pinouts and check the cable for continuity.
c.Check that the twisted pair connection meets the specifications in the Cabling Guide.
If a link is not established, contact Enterasys Networks. Refer to Getting Help in About This Guide for details.
5.Repeat all the steps above until all RJ21 connections are made.
3.4COMPLETING THE INSTALLATION
After installing the module and making the connections to the network, proceed as follows:
1.If the chassis is installed in a rack that has
2.The module is now ready to be configured through Local Management. Refer to the MATRIX E5 Series Modules Local Management User’s Guide for information on how to access and use Local Management. For details on how to get manuals, refer to the Related Documents section in About This Guide.