Step 6.1 Burner Tube Installation
NOTE:
Tubing requires a downward slope of 1/2" (1.3 cm)
per 20' (6 m) away from burner.
Hanger
Burner Tube
7' 6" ± 1'
(229 cm ± 25 cm)
Offset mounting hole must be to the top.
Weld seam must be to the bottom of the tube.
Description | Part Number |
Burner Tube | 03051XXX |
|
|
91907302 | |
|
|
Tube/Reflector Hanger | 03090100 |
|
|
Step 6.2 Tube Clamp Package Installation
Description | Part Number |
| Bolt | |
Tube Clamp Package | 01318901 | Tube Clamp | ||
| ||||
Tube Clamp | 01396801 | Flat |
| |
Bolt | 97113940 |
| ||
Washer |
| |||
Flat Washer | 95211600 |
| ||
|
| |||
Nut | 92113900 |
|
|
Nut
(Torque 120 in/lb 13.56 Nm)
16 of 71