Aiko CTH3-80, CTH3-150, CTH3-200, CTH3-115 service manual Table of Figures

Page 5

TABLE OF FIGURES

 

Figure 1: Top and Bottom Panel Label Placement

2

Figure 2: Side and Back Panel Label Placement

3

Figure 3: Standard Reflector

5

Figure 4: One Side Reflector

6

Figure 5: Two Side Reflectors

6

Figure 6: 45° Tilt Reflector

6

Figure 7: U-Tube, Standard Reflector

7

Figure 8: U-Tube, 45°

7

Figure 9: U-Tube, Opposite 45° Reflector

7

Figure 10: 2-Foot Deco Grille and Protective Grille

8

Figure 11: Lower Clearance Shield

8

Figure 12: Venting

8

Figure 13: Major Component Descriptions

10

Figure 14: Critical Hanger Placement

13

Figure 15: Linear Heater Assembly Overview

14

Figure 16: Linear Heater Layout Overview

15

Figure 17: U-Tube Heater Assembly Overview

23

Figure 18: U-Tube Heater Layout Overview

24

Figure 19: Reflector Joint Detail

26

Figure 20: Tube Termination

32

Figure 21: Gas Connection with Flexible Gas Hose

38

Figure 22: Zone Sensor Wiring Diagram

39

Figure 23: Central Heater Jumper Settings

40

Figure 24: Satellite Heater Jumper Setting

41

Figure 25: Communication Wiring within a Zone of Heaters ...

42

Figure 25: Communication Wiring within a Zone of Heaters

 

(continued)

43

Figure 26: Thermostat Control Wiring Diagram

44

Figure 27: Analog Control Signal Wiring Diagram

47

Figure 28: Potentiometer Control Wiring Diagram

48

Figure 29: Modulating Thermostat Wiring Diagram

 

(LonWorks® [4-20 mA] optional)

49

Figure 30: Modulating Thermostat Wiring Diagram

 

(LonWorks® [2-10Vdc with 500 Ohm resistor]

 

optional)

50

Figure 31: Modulating Thermostat Wiring Diagram

 

with BACnet® (optional)

51

LIST OF TABLES

 

Table 1: Contents of Burner Carton

11

Table 2: Contents of Core and Extension Packages

11

Table 3: CTH3-Series Component Package Guide

11

Table 4: Cable Requirements

46

Image 5
Contents Gas-Fired, Low Intensity Unitary Heater Page Roberts-Gordon LLC Page Table of Figures Page Manpower Requirements Heater SafetySafety Labels and Their Placement California PropositionTop and Bottom Panel Label Placement Side and Back Panel Label Placement Wall Tag Installer ResponsibilityCorrosive Chemicals National Standards and Applicable CodesInches Centimeters Model Maintain clearances to combustibles at all times for safetyONE Side Reflector Tube TUBE, Standard ReflectorUnapproved Foot Deco Grille and Protective GrilleNational Standards and Applicable Codes Major Components Model Tubing Length Core Packages Minimum Aluminized Standard Parts ListHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Tube Clamp Package Installation Burner Tube InstallationInsert tubes into coupling Tighten coupling to join tubes Coupling and Tube AssemblyTurbulator Installation 2 Coupling and Tube AssemblyHanger Burner Tube Reflector Reflector InstallationDescription Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationWindow facing down Burner InstallationTube Configuration Optional Heater AccessoriesTube Heater Assembly Overview Tube Heater Layout Overview 3 Reflector Joint Installation Elbow Package Configuration .2.1 Elbow Installation2 Elbow Installation Reflector Joint Detail 4 Reflector Joint Installation 5 Reflector Joint DetailReflector Side Extension 2 Side Reflector InstallationScr ews 2 Frame Shield Installation 3 Grille Installation 2 Grille End Cap InstallationUnvented Operation United States RequirementsCanadian Requirements Vertical Venting Horizontal VentingUnvented Operation Tube Termination Length RequirementsCommon Side Wall Venting Vertical Ventilation 4 10 cm PipeCommon Vertical Venting Side View Vertical Outside Air Supply for Single Heater InstallationOutside Combustion Air Supply TOP View Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Standard Heater Configuration WiringCentral and Satellite Heaters Zoning Capability Central Heater ConfigurationSatellite Heater Jumper Setting Satellite Heater ConfigurationCommunication Wiring within a Zone of Heaters Communication Wiring within a Zone of Heaters Thermostat Heat Demand Control WiringZone Sensor Sequence of Operation for Modulating Thermostats Analog Signal Modulating Thermostat P/NMS/TP Wiring Cable Termination Power RequirementsRemote Analog Signal Analog Control Signal Wiring Diagram Potentiometer Control Device Potentiometer Control Wiring DiagramThermostat, modulating Description Part Number Modulating Thermostat Wiring Diagram with BACnet optional Internal Wiring Ladder Diagram Electrical Connection to the Burner Line Voltage Power WiringLow Voltage Control Wiring Installation Pre-Season Maintenance and Annual Inspection Operation and MaintenanceSequence of Operation To Shut Off HeaterVicinity of the Heater Installation Code and Annual InspectionsVehicles and Other ObjectsSafety Labels MA wiring Suspension PointsGas Line Burner ObservationTroubleshooting General LED Codes Control LEDTroubleshooting Troubleshooting Flow Chart Troubleshooting Manifold Gas Pressure Measurement Pneumatic Connections Replacement Parts Replacement Parts Description Part Number Dimensions General SpecificationsGAS Pressure AT Manifold Pipe ConnectionPage ROBERTS-GORDON will PAY for Warranty is Void ifROBERTS-GORDON will not PAY for Limitations on Authority RepresentativesPage Page Page