Aiko CTH3-115, CTH3-150, CTH3-80, CTH3-200 service manual Burner Installation, Window facing down

Page 27

SECTION 6: HEATER INSTALLATION

Step 6.6 Burner Installation

Burner

 

Burner must be installed

 

 

with the flame observation

Lock

 

window facing down.

 

Washer

 

 

 

 

 

 

 

Description

 

Part Number

 

Bolt

 

94273914

 

 

 

 

 

Burner

 

034XXXXX

 

 

 

 

 

Lock Washer

 

96411600

 

 

 

 

 

Gasket

 

02568200

 

 

 

 

 

Gasket

S-hook

Burner Tube

Bolt (Torque 120 13.56 Nm)

21 of 71

Image 27
Contents Gas-Fired, Low Intensity Unitary Heater Page Roberts-Gordon LLC Page Table of Figures Page California Proposition Heater SafetyManpower Requirements Safety Labels and Their PlacementTop and Bottom Panel Label Placement Side and Back Panel Label Placement National Standards and Applicable Codes Installer ResponsibilityWall Tag Corrosive ChemicalsInches Centimeters Model Maintain clearances to combustibles at all times for safetyONE Side Reflector Tube TUBE, Standard ReflectorUnapproved Foot Deco Grille and Protective GrilleNational Standards and Applicable Codes Major Components Model Tubing Length Core Packages Minimum Aluminized Standard Parts ListHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Tube Clamp Package Installation Burner Tube InstallationInsert tubes into coupling Tighten coupling to join tubes Coupling and Tube AssemblyTurbulator Installation 2 Coupling and Tube AssemblyHanger Burner Tube Reflector Reflector InstallationDescription Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationWindow facing down Burner InstallationTube Configuration Optional Heater AccessoriesTube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Configuration .2.1 Elbow Installation 2 Elbow Installation3 Reflector Joint Installation Reflector Joint Detail 4 Reflector Joint Installation 5 Reflector Joint DetailReflector Side Extension 2 Side Reflector InstallationScr ews 2 Frame Shield Installation 3 Grille Installation 2 Grille End Cap InstallationUnited States Requirements Canadian RequirementsUnvented Operation Length Requirements Horizontal VentingVertical Venting Unvented Operation Tube TerminationCommon Side Wall Venting Vertical Ventilation 4 10 cm PipeCommon Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplySide View TOP View Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Standard Heater Configuration WiringCentral and Satellite Heaters Zoning Capability Central Heater ConfigurationSatellite Heater Jumper Setting Satellite Heater ConfigurationCommunication Wiring within a Zone of Heaters Communication Wiring within a Zone of Heaters Heat Demand Control Wiring Zone SensorThermostat Analog Signal Modulating Thermostat P/N MS/TP WiringSequence of Operation for Modulating Thermostats Power Requirements Remote Analog SignalCable Termination Analog Control Signal Wiring Diagram Potentiometer Control Device Potentiometer Control Wiring DiagramThermostat, modulating Description Part Number Modulating Thermostat Wiring Diagram with BACnet optional Internal Wiring Ladder Diagram Electrical Connection to the Burner Line Voltage Power WiringLow Voltage Control Wiring Installation To Shut Off Heater Operation and MaintenancePre-Season Maintenance and Annual Inspection Sequence of OperationObjects Installation Code and Annual InspectionsVicinity of the Heater Vehicles and OtherBurner Observation MA wiring Suspension PointsSafety Labels Gas LineTroubleshooting General LED Codes Control LEDTroubleshooting Troubleshooting Flow Chart Troubleshooting Manifold Gas Pressure Measurement Pneumatic Connections Replacement Parts Replacement Parts Description Part Number Pipe Connection General SpecificationsDimensions GAS Pressure AT ManifoldPage Limitations on Authority Representatives Warranty is Void ifROBERTS-GORDON will PAY for ROBERTS-GORDON will not PAY forPage Page Page