Aiko CTH3-80, CTH3-150 United States Requirements, Canadian Requirements, Unvented Operation

Page 37

SECTION 8: VENTING

SECTION 8: VENTING

WARNING

Carbon Monoxide Hazard

Heaters installed unvented must be interlocked with sufficient building exhaust.

Heaters must be installed according to the installation manual.

Failure to follow these instructions can result in death or injury.

WARNING

Cut/Pinch Hazard

Wear protective gear during installation, operation and service.

Edges are sharp.

Failure to follow these instructions can result in injury.

8.1 Venting

This heater must be vented in accordance with the rules contained in this manual and with the following national codes and any state, provincial or local codes which may apply:

United States: Refer to National Fuel Gas Code NFPA 54/ANSI Z223.1 - latest revision.

Canada: Refer to Natural Gas and Propane Installation Code CSA B149.1 - latest revision.

Exhaust end of heater will accept a 4" (10 cm) vent pipe using the vent adapter (P/N 90502700). To prevent leakage of condensation, install the vent adapter with the seam on top and seal the joint using a high temperature silicone sealant.

Any portion of vent pipe passing through a combustible wall must have an approved thimble to conform with the above listed codes.

Vent pipe must be sloped downward away from the burner 1/2'' (1 cm) for every 20' (6 m).

The heater may be individually vented or common

vented. When venting horizontally, a maximum of two heaters can be commonly vented. See Page 33, Section 8.9. When venting vertically, a maximum of four heaters can be commonly vented. See Page 34, Section 8.10.

The heater may also be installed unvented in certain circumstances according to building ventilation codes. Refer to the above codes and Page 31, Section 8.2 for further information. Unvented operation also requires compliance with the clearances to combustibles given on Page 8, Figure 12.

The bottom of the vent or air intake terminal shall not be located less than 1' (.3 m) above grade level.

The vent shall not terminate less than 7' (2.1 m) above grade where located adjacent to public walkways.

Vent terminal must be installed at a height sufficient to prevent blockage by snow and building materials protected from degradation by flue gasses.

Secure all joints with #8 x 3/8 sheet metal screws. Seal all joints with high temperature silicone sealant.

Vent terminal must be beyond any combustible overhang.

8.1.1 United States Requirements

Vent must terminate at least 3' (.9 m) above any forced air inlet located within 10' (3.1 m).

Vent must terminate at least 4' (1.2 m) below,

4' (1.2 m) horizontally from, or 1' (.3 m) above any door, operable window, or gravity air inlet into any building.

8.1.2 Canadian Requirements

The vent shall not terminate within 6' (1.8 m) of a mechanical air supply inlet to any building.

The vent shall not terminate within 3' (.9 m) of a

window or door that can be opened in any building, any non-mechanical air supply inlet to any building, or of the combustion air inlet of any other appliance.

8.2 Unvented Operation

Sufficient ventilation must be provided in the amount of 4 cfm per 1000 Btu/h firing rate (United States); 3 cfm per 1000 Btu/h firing rate (Canada).

Use of optional outside combustion air is not recommended with unvented heaters.

If exhaust fans are used to supply ventilation air, an interlock switch must be used to prevent the heater from coming on when the fans are off. This may be done using a pressure switch.

31 of 71

Image 37
Contents Gas-Fired, Low Intensity Unitary Heater Page Roberts-Gordon LLC Page Table of Figures Page Manpower Requirements Heater SafetySafety Labels and Their Placement California PropositionTop and Bottom Panel Label Placement Side and Back Panel Label Placement Wall Tag Installer ResponsibilityCorrosive Chemicals National Standards and Applicable CodesInches Centimeters Model Maintain clearances to combustibles at all times for safetyONE Side Reflector Tube TUBE, Standard ReflectorUnapproved Foot Deco Grille and Protective GrilleNational Standards and Applicable Codes Major Components Model Tubing Length Core Packages Minimum Aluminized Standard Parts ListHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Tube Clamp Package Installation Burner Tube InstallationInsert tubes into coupling Tighten coupling to join tubes Coupling and Tube AssemblyTurbulator Installation 2 Coupling and Tube AssemblyHanger Burner Tube Reflector Reflector InstallationDescription Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationWindow facing down Burner InstallationTube Configuration Optional Heater AccessoriesTube Heater Assembly Overview Tube Heater Layout Overview 2 Elbow Installation Elbow Package Configuration .2.1 Elbow Installation3 Reflector Joint Installation Reflector Joint Detail 4 Reflector Joint Installation 5 Reflector Joint DetailReflector Side Extension 2 Side Reflector InstallationScr ews 2 Frame Shield Installation 3 Grille Installation 2 Grille End Cap InstallationCanadian Requirements United States RequirementsUnvented Operation Vertical Venting Horizontal VentingUnvented Operation Tube Termination Length RequirementsCommon Side Wall Venting Vertical Ventilation 4 10 cm PipeCommon Vertical Venting Outside Combustion Air Supply Vertical Outside Air Supply for Single Heater InstallationSide View TOP View Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Standard Heater Configuration WiringCentral and Satellite Heaters Zoning Capability Central Heater ConfigurationSatellite Heater Jumper Setting Satellite Heater ConfigurationCommunication Wiring within a Zone of Heaters Communication Wiring within a Zone of Heaters Zone Sensor Heat Demand Control WiringThermostat MS/TP Wiring Analog Signal Modulating Thermostat P/NSequence of Operation for Modulating Thermostats Remote Analog Signal Power RequirementsCable Termination Analog Control Signal Wiring Diagram Potentiometer Control Device Potentiometer Control Wiring DiagramThermostat, modulating Description Part Number Modulating Thermostat Wiring Diagram with BACnet optional Internal Wiring Ladder Diagram Electrical Connection to the Burner Line Voltage Power WiringLow Voltage Control Wiring Installation Pre-Season Maintenance and Annual Inspection Operation and MaintenanceSequence of Operation To Shut Off HeaterVicinity of the Heater Installation Code and Annual InspectionsVehicles and Other ObjectsSafety Labels MA wiring Suspension PointsGas Line Burner ObservationTroubleshooting General LED Codes Control LEDTroubleshooting Troubleshooting Flow Chart Troubleshooting Manifold Gas Pressure Measurement Pneumatic Connections Replacement Parts Replacement Parts Description Part Number Dimensions General SpecificationsGAS Pressure AT Manifold Pipe ConnectionPage ROBERTS-GORDON will PAY for Warranty is Void ifROBERTS-GORDON will not PAY for Limitations on Authority RepresentativesPage Page Page