Aiko CTH3-150, CTH3-80, CTH3-200, CTH3-115 Coupling and Tube Assembly, Turbulator Installation

Page 24

CTH3-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 6.3.2 Coupling and Tube Assembly (Continued)

 

Tube Length

Model

Minimum

CTH3-80

20' (6 m)

CTH3-115

30' (9 m)

CTH3-150

40' (12 m)

CTH3-200

50' (15 m)

7' 6" ± 1'

 

(2.3 m ± .25 m)

 

10' ± 1'

 

(3 m ± .25 m)

 

Total Overall

 

Tube Length

 

Step 6.4 Turbulator Installation

Turbulator

Section

TurbulatorTab

Adapter

Description

Part Number

Turbulator Adapter

03051503

Turbulator Section

03051504

Tube

91409XXX

Turbulator must be installed in the last standard section of tube. Turbulator is not required on the CTH3-200.

T

Turbulator Installation

CTH3-80

2nd 10' Section

w

i

CTH3-115

3rd 10' Section

s

t

CTH3-150

4th 10' Section

 

 

CTH3-200

N/A

Pull String

Fold tab around outside

of tube nearest to the vent to hold turbulator in place.

18 of 71

Image 24
Contents Gas-Fired, Low Intensity Unitary Heater Page Roberts-Gordon LLC Page Table of Figures Page Heater Safety Manpower RequirementsSafety Labels and Their Placement California PropositionTop and Bottom Panel Label Placement Side and Back Panel Label Placement Installer Responsibility Wall TagCorrosive Chemicals National Standards and Applicable CodesMaintain clearances to combustibles at all times for safety Inches Centimeters ModelONE Side Reflector TUBE, Standard Reflector TubeFoot Deco Grille and Protective Grille UnapprovedNational Standards and Applicable Codes Major Components Standard Parts List Model Tubing Length Core Packages Minimum AluminizedHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Tube Clamp Package InstallationCoupling and Tube Assembly Insert tubes into coupling Tighten coupling to join tubes2 Coupling and Tube Assembly Turbulator InstallationReflector Installation Hanger Burner Tube Reflector1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Window facing downOptional Heater Accessories Tube ConfigurationTube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Configuration .2.1 Elbow Installation 2 Elbow Installation3 Reflector Joint Installation 4 Reflector Joint Installation 5 Reflector Joint Detail Reflector Joint Detail2 Side Reflector Installation Reflector Side ExtensionScr ews 2 Frame Shield Installation 2 Grille End Cap Installation 3 Grille InstallationUnited States Requirements Canadian RequirementsUnvented Operation Horizontal Venting Vertical VentingUnvented Operation Tube Termination Length RequirementsVertical Ventilation 4 10 cm Pipe Common Side Wall VentingCommon Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplySide View Vertical Outside Air Supply for Double Heater Installation TOP ViewGAS Piping Correct Positions Wiring Standard Heater ConfigurationCentral Heater Configuration Central and Satellite Heaters Zoning CapabilitySatellite Heater Configuration Satellite Heater Jumper SettingCommunication Wiring within a Zone of Heaters Communication Wiring within a Zone of Heaters Heat Demand Control Wiring Zone SensorThermostat Analog Signal Modulating Thermostat P/N MS/TP WiringSequence of Operation for Modulating Thermostats Power Requirements Remote Analog SignalCable Termination Analog Control Signal Wiring Diagram Potentiometer Control Wiring Diagram Potentiometer Control DeviceThermostat, modulating Description Part Number Modulating Thermostat Wiring Diagram with BACnet optional Internal Wiring Ladder Diagram Line Voltage Power Wiring Electrical Connection to the BurnerLow Voltage Control Wiring Installation Operation and Maintenance Pre-Season Maintenance and Annual InspectionSequence of Operation To Shut Off HeaterInstallation Code and Annual Inspections Vicinity of the HeaterVehicles and Other ObjectsMA wiring Suspension Points Safety LabelsGas Line Burner ObservationTroubleshooting Control LED General LED CodesTroubleshooting Troubleshooting Flow Chart Troubleshooting Manifold Gas Pressure Measurement Pneumatic Connections Replacement Parts Replacement Parts Description Part Number General Specifications DimensionsGAS Pressure AT Manifold Pipe ConnectionPage Warranty is Void if ROBERTS-GORDON will PAY forROBERTS-GORDON will not PAY for Limitations on Authority RepresentativesPage Page Page