Aiko
CTH3-150, CTH3-80, CTH3-200, CTH3-115 Reflector Joint Installation 5 Reflector Joint Detail
Troubleshooting
Specifications
Install
Parts list
Ladder Diagram
Remote Analog Signal
Wiring
Warranty
Maintenance
Tube Configuration
Page 32
CTH3-S
ERIES
I
NSTALLATION
, O
PERATION AND
S
ERVICE
M
ANUAL
Step 7.2.4 Reflector Joint Installation
Step 7.2.5 Reflector Joint Detail
FIGURE 19: Reflector Joint Detail
26 of 71
Page 31
Page 33
Image 32
Page 31
Page 33
Contents
Gas-Fired, Low Intensity Unitary Heater
Page
Roberts-Gordon LLC
Page
Table of Figures
Page
Heater Safety
Manpower Requirements
Safety Labels and Their Placement
California Proposition
Top and Bottom Panel Label Placement
Side and Back Panel Label Placement
Installer Responsibility
Wall Tag
Corrosive Chemicals
National Standards and Applicable Codes
Maintain clearances to combustibles at all times for safety
Inches Centimeters Model
ONE Side Reflector
TUBE, Standard Reflector
Tube
Foot Deco Grille and Protective Grille
Unapproved
National Standards and Applicable Codes
Major Components
Standard Parts List
Model Tubing Length Core Packages Minimum Aluminized
Heater Installation
Typical Suspension Details
Linear Heater Assembly Overview
Linear Heater Layout Overview
Burner Tube Installation
Tube Clamp Package Installation
Coupling and Tube Assembly
Insert tubes into coupling Tighten coupling to join tubes
2 Coupling and Tube Assembly
Turbulator Installation
Reflector Installation
Hanger Burner Tube Reflector
1 Reflector, U-Clip and Reflector Support Installation
Description Part Number Reflector Support Package
Burner Installation
Window facing down
Optional Heater Accessories
Tube Configuration
Tube Heater Assembly Overview
Tube Heater Layout Overview
3 Reflector Joint Installation
Elbow Package Configuration .2.1 Elbow Installation
2 Elbow Installation
4 Reflector Joint Installation 5 Reflector Joint Detail
Reflector Joint Detail
2 Side Reflector Installation
Reflector Side Extension
Scr ews
2 Frame Shield Installation
2 Grille End Cap Installation
3 Grille Installation
Unvented Operation
United States Requirements
Canadian Requirements
Horizontal Venting
Vertical Venting
Unvented Operation Tube Termination
Length Requirements
Vertical Ventilation 4 10 cm Pipe
Common Side Wall Venting
Common Vertical Venting
Side View
Vertical Outside Air Supply for Single Heater Installation
Outside Combustion Air Supply
Vertical Outside Air Supply for Double Heater Installation
TOP View
GAS Piping
Correct Positions
Wiring
Standard Heater Configuration
Central Heater Configuration
Central and Satellite Heaters Zoning Capability
Satellite Heater Configuration
Satellite Heater Jumper Setting
Communication Wiring within a Zone of Heaters
Communication Wiring within a Zone of Heaters
Thermostat
Heat Demand Control Wiring
Zone Sensor
Sequence of Operation for Modulating Thermostats
Analog Signal Modulating Thermostat P/N
MS/TP Wiring
Cable Termination
Power Requirements
Remote Analog Signal
Analog Control Signal Wiring Diagram
Potentiometer Control Wiring Diagram
Potentiometer Control Device
Thermostat, modulating
Description Part Number
Modulating Thermostat Wiring Diagram with BACnet optional
Internal Wiring
Ladder Diagram
Line Voltage Power Wiring
Electrical Connection to the Burner
Low Voltage Control Wiring Installation
Operation and Maintenance
Pre-Season Maintenance and Annual Inspection
Sequence of Operation
To Shut Off Heater
Installation Code and Annual Inspections
Vicinity of the Heater
Vehicles and Other
Objects
MA wiring Suspension Points
Safety Labels
Gas Line
Burner Observation
Troubleshooting
Control LED
General LED Codes
Troubleshooting
Troubleshooting Flow Chart
Troubleshooting
Manifold Gas Pressure Measurement
Pneumatic Connections
Replacement Parts
Replacement Parts
Description Part Number
General Specifications
Dimensions
GAS Pressure AT Manifold
Pipe Connection
Page
Warranty is Void if
ROBERTS-GORDON will PAY for
ROBERTS-GORDON will not PAY for
Limitations on Authority Representatives
Page
Page
Page
Related pages
All Install page
Installation for Emerson 60HZ
Installing a Radius Server for ZyXEL Communications 153X
112 of 456 Installing DC power for Nortel Networks 1000M
Other settings in the Install menu for Philips 28PW6108/01
Installation procedure for Unix systems for IBM TDS400
Install Card SenseTMSingle Card Feed Kit for Zebra Technologies P120i
To install a Dimm for HP 8000 s
Sådan installeres batterierne batteristørrelse AAA Engelsk for Samsung LT27C370EW/XE
To Install standard alkaline batteries for VocoPro ORANGE-300
What do I do in case of shipping damage during warranty service?
Shipping Information
Top
Page
Image
Contents