Aiko CTH3-200, CTH3-150 Horizontal Venting, Vertical Venting, Unvented Operation Tube Termination

Page 38

CTH3-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

 

8.3 Horizontal Venting

FIGURE 20: Tube Termination

In noncombustible walls only, vent terminal (P/N 02537801-1P) may be used.

For 4" (10 cm) vents in either combustible or noncombustible walls, use Tjernlund VH1-4 (P/N 90502100) or equivalent, insulated vent terminal. Follow the manufacturer's instructions for proper installation.

For 6" (15 cm) common vents in either combustible or noncombustible walls, use Tjernlund VH1-6 (P/N 90502101) or equivalent, insulated vent terminal. Follow the manufacturer's instructions for proper installation.

8.4 Vertical Venting

For 4" (10 cm), an approved vent cap (P/N 90502300) must be used.

For 6" (15 cm) common vent, an approved vent cap (P/N 90502302) must be used.

For common vertical venting of more than two heaters, See Page 34, Section 8.10.

A vent shall not extend less than 2' (.6m) above the highest point where it passes through a flat roof of a building.

8.5 Unvented Operation Tube Termination

Turndown type vent terminal with a screen must be installed at the exhaust end of the tube. Vent terminal design shall not incorporate backdraft flap.

8.6 Length Requirements

The maximum vent length allowed is 45' (13.7 m). The maximum outside air supply duct length allowed is 45' (13.7 m).

The total vent length, plus outside air duct length and any extensions to minimum heat exchanger lengths, cannot exceed 65' (19.8 m).

Vent length should be limited to less than 20' (6 m). If using extended heater lengths or vent lengths greater than 20' (6 m), condensation will form in the vent pipe. Insulation and additional sealing measures (high temperature silicone at all seams) are required. Optional heat exchanger beyond minimum lengths are considered as vent length for length determination.

Subtract 15' (4.6 m) of maximum allowed vent or duct length per vent elbow if more than two are used.

8.7 Horizontal Ventilation 4" (10 cm) Pipe

 

 

SIDE VIEW

 

 

Combustible or

 

Non-Combustible Wall Only

 

Non-Combustible Wall

 

Vent Adapter

 

Vent Adapter

 

 

18" (46 cm)

 

 

 

 

 

 

Min.

4" (10 cm)

 

 

 

Single Wall Pipe

 

 

Vent Terminal

 

 

4" (10 cm) Single Wall Pipe

 

Vent Terminal

 

 

 

 

Description

Part Number

 

 

Vent Terminal (Comb. Wall)

90502100

 

 

Vent Terminal

02537801-XX

 

 

32 of 71

Image 38
Contents Gas-Fired, Low Intensity Unitary Heater Page Roberts-Gordon LLC Page Table of Figures Page Safety Labels and Their Placement Heater SafetyManpower Requirements California PropositionTop and Bottom Panel Label Placement Side and Back Panel Label Placement Corrosive Chemicals Installer ResponsibilityWall Tag National Standards and Applicable CodesMaintain clearances to combustibles at all times for safety Inches Centimeters ModelONE Side Reflector TUBE, Standard Reflector TubeFoot Deco Grille and Protective Grille UnapprovedNational Standards and Applicable Codes Major Components Standard Parts List Model Tubing Length Core Packages Minimum AluminizedHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Tube Clamp Package InstallationCoupling and Tube Assembly Insert tubes into coupling Tighten coupling to join tubes2 Coupling and Tube Assembly Turbulator InstallationReflector Installation Hanger Burner Tube Reflector1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Window facing downOptional Heater Accessories Tube ConfigurationTube Heater Assembly Overview Tube Heater Layout Overview 3 Reflector Joint Installation Elbow Package Configuration .2.1 Elbow Installation2 Elbow Installation 4 Reflector Joint Installation 5 Reflector Joint Detail Reflector Joint Detail2 Side Reflector Installation Reflector Side ExtensionScr ews 2 Frame Shield Installation 2 Grille End Cap Installation 3 Grille InstallationUnvented Operation United States RequirementsCanadian Requirements Unvented Operation Tube Termination Horizontal VentingVertical Venting Length RequirementsVertical Ventilation 4 10 cm Pipe Common Side Wall VentingCommon Vertical Venting Side View Vertical Outside Air Supply for Single Heater InstallationOutside Combustion Air Supply Vertical Outside Air Supply for Double Heater Installation TOP ViewGAS Piping Correct Positions Wiring Standard Heater ConfigurationCentral Heater Configuration Central and Satellite Heaters Zoning CapabilitySatellite Heater Configuration Satellite Heater Jumper SettingCommunication Wiring within a Zone of Heaters Communication Wiring within a Zone of Heaters Thermostat Heat Demand Control WiringZone Sensor Sequence of Operation for Modulating Thermostats Analog Signal Modulating Thermostat P/NMS/TP Wiring Cable Termination Power RequirementsRemote Analog Signal Analog Control Signal Wiring Diagram Potentiometer Control Wiring Diagram Potentiometer Control DeviceThermostat, modulating Description Part Number Modulating Thermostat Wiring Diagram with BACnet optional Internal Wiring Ladder Diagram Line Voltage Power Wiring Electrical Connection to the BurnerLow Voltage Control Wiring Installation Sequence of Operation Operation and MaintenancePre-Season Maintenance and Annual Inspection To Shut Off HeaterVehicles and Other Installation Code and Annual InspectionsVicinity of the Heater ObjectsGas Line MA wiring Suspension PointsSafety Labels Burner ObservationTroubleshooting Control LED General LED CodesTroubleshooting Troubleshooting Flow Chart Troubleshooting Manifold Gas Pressure Measurement Pneumatic Connections Replacement Parts Replacement Parts Description Part Number GAS Pressure AT Manifold General SpecificationsDimensions Pipe ConnectionPage ROBERTS-GORDON will not PAY for Warranty is Void ifROBERTS-GORDON will PAY for Limitations on Authority RepresentativesPage Page Page