10 OPTIONAL INSTALLATIONS/SETTINGS
■
DInstallation
➀Open the transceiver case as shown on p. 59.
➁Remove the
➂Plug the
➃Plug the supplied ribbon cable into J3 on the UT- 106 and J253 on the PLL unit.
•Be careful of the orientation of the ribbon cable.
MAIN unit
P1
J1431
Remove the J1431 connector from the PLL unit and replace with the
➄Attach the
➅Reassemble the transceiver.
DOperation
Refer to the instructions supplied with the
Be careful of the orientation
J3
J1
PLL unit
P251
P253
P1
unit position
■MB-72 CARRYING HANDLE
The optional
➀Remove the 2 screws from the right side of the transceiver as shown below.
➁Replace those with 2 supplied screws plus rubber
rubber feet
feet and additionally attach 2 more supplied screws (including rubber feet) as shown below.
•When replacing the 2 screws at the rear, be sure to squeeze the top and bottom covers together to ensure proper alignment.
➂Attach the
carrying handle
61