Table of Contents
1 | General Information | 7 | |
| Introduction | 7 | |
| Necessary Documents | 7 | |
| Models Covered | 8 | |
| Standard Features | 8 | |
| Available Options | 9 | |
2 | Shipping Information | 15 | |
| Unpacking and Inspection | 15 | |
| In the Event of Shipping Damages | 15 | |
| If the Shipment is Not Complete | 16 | |
| If the Shipment is Not Correct | 16 | |
| Returns | 16 | |
| Uncrating Your New Chiller | 17 | |
3 | Installation | 19 | |
| Installation Location Considerations | 19 | |
| Making Electrical Connections | 19 | |
| Piping Considerations | 21 | |
| Making Process Water Connections | 21 | |
| Making Tank Piping Connections | 22 | |
| Water Connection Sizing Considerations | 23 | |
| Galvanic Corrosion Considerations | 23 | |
| Water Treatment Considerations | 23 | |
| Making | 23 | |
| Installing the Remote | 24 | |
| Checking Motor Direction | 25 | |
4 | Sequence Of Operation | 26 | |
| Staging | 27 | |
| Alarms | 27 | |
| 27 | ||
| 27 | ||
| Chilled Water Circuit | 28 | |
| Refrigeration Circuit | 28 | |
| Freezestat Control | 28 | |
| High Pressure Cutout | 30 | |
| Low Pressure Cutout | 30 | |
| Flow Switch | 30 | |
| Control Nipple | 31 | |
| Control Probe | 31 | |
| Chilled Water Manifold | 31 | |
| Condenser Water Manifold | 31 | |
Page 4 of 86 | SSC Series Central Chilling Stations |