9-3 Evaporator Maintenance
The evaporator(s) may be accessed for
9-4 Pump Motor Seal
Pump seals require water for lubrication, so the pump(s) must never be run dry. Always fill the tank before attempting to operate the pump(s). Seal failures usually follow a period of dry operation of the pump.
9-5 Makeup Valve
Periodically inspect the water makeup valve assembly for proper operation. If the valve no longer shuts off completely or reliably, replace it. The plastic ball float should be buoyant for proper operation.
9-6 Recommended Pump Tank Spare Parts
Part no. | Part description | Quantity |
A0550190 | Pressure gauge | 1 per pump |
A0102396 | Float valve, 1” (approx. 25 mm) | 1 per tank |
A0069538 | Plastic ball float, 6” (approx. 152 mm) | 1 per tank |
A0102394 | Float rod, 10” (25 cm) | 1 per tank |
- Call Sterling | Pump seal and casing gasket | 1 per pump |
Parts - |
|
|
Check your Customer Information Packet for a complete list of spare parts and part numbers for your SSC Series chilling station.
Page 74 of 86 | SSC Series Central Chilling Stations |