Linear VS-GSWG manual This page left blank intentionally

Page 33

This page left blank intentionally.

VS-GSWG Swing Gate Operator Installation Guide

- 31 -

P1250 Revision X6 7-8-2011

 

Image 33
Contents VS-GSWG Table of Contents Safety Information and Warnings Pre-installation InformationWiring Specifications AC Power WiringDC Control and Accessory Wiring Mounting Pad Installation Gate PreparationMounting Specifications Vent Plug Installation Gate Arm InstallationGate Arm Assembly Operator PreparationController Access Operator SetupAC Power Connection Earth GroundLimit Nuts Rough Adjustment Open and Close Limit AdjustmentLimit Nuts Fine Adjustment Setting Speeds using LSO-2 & LSC-2Loosen the set screw on the adjustment nut Torque Limiter AdjustmentButtons Controller FeaturesApex Function Display Indications Indicator DescriptionsTerminal Group Function Terminal DescriptionsOperator Accessory Connections Operator Accessory ConnectionsBasic Controller Programming Run Alarm and Pre-start Alarm Maximum Open Direction Current SettingMaximum Close Direction Current Setting Advanced Controller Programming Reverse Delay Time Auxiliary Relay ModeBrake Delay Time Constant Pressure ModeMaintenance Alert Trigger Reset Cycle CountAnti-tailgate Enable Radio EnableRadio Transmitter Learn Reset Controller to Factory DefaultsRadio Transmitter Delete MGT Obstacle Transmitter LearnLoop Layout Illustration Safety Edge Layout Illustration Photoeye Installation Illustration Dual Gate Installations Open and Close Limit settingsOptional In-Cabinet Heater Operation Indications Gate OperationEntrapment Error IndicationsComm Link Connection Failure MGT Obstacle Transmitter TroubleTroubleshooting Month Preventative Maintenance Preventative MaintenanceFCC Notice GeneralModel VS-GSWG Exploded View Model SWG Mechanical Parts List Variable Speed Control Box Assemblies Controller Parts ListProgramming the Hitachi Inverter Variable Speed Drive ProgrammingShown for Clarity only not Included in ARM Assembly Gate Arm Assembly Parts ListThis page left blank intentionally Gate Operator Installation Checklist