Linear VS-GSWG manual Mounting Pad Installation, Gate Preparation, Mounting Specifications

Page 5

Mounting Pad Installation

The gate operator mounts bolted to posts secured in concrete footings. The posts support the operator and prevent it from moving during operation.

Gate Preparation

Before installing the gate operator, make sure the gate’s swing is free and level throughout the entire swing path. If the gate does not seem to operate properly, it may affect the operator performance or greatly shorten the life of the unit. The gate should be designed so that airfl ow is ample to prevent wind resistance and drag.

Mounting Specifications

Use two 3 - 3-1/2” OD galvanized posts and secure with concrete footings as shown, length to be determined by local codes, frost line depth and soil conditions.

Attach the operator with the U-bolts, side plates and hardware provided. Four 3/16” side plates go on the outside top and bottom, two 3/16” side plates go on the inside top, and two 1/2” side plates go on the inside bottom (see the illustration at right). The operator should be positioned at a level to allow the arm to be installed at mid-height on the gate. “H” dimension can vary depending on gate construction. Make sure the posts do not protrude above the operator cabinet.

NOTE: If non-standard mounting is necessary, consult the factory.

WARNING

The operator is intended for installation only on gates used for vehicles. Pedestrians must be supplied with a separate access opening. The pedestrian access opening shall be designed to promote pedestrian usage. Locate the gate such that persons will not come into contact with the vehicular gate during the entire path of travel of the vehicular gate.

WARNING

The gate must be installed in a location so that enough clearance is supplied between the gate and adjacent structures when opening and closing to reduce the risk of entrapment. Swing gates shall not open into public areas.

Figure 1. Side Plate Installation

Figure 2. Mounting Pad Specifications

VS-GSWG Swing Gate Operator Installation Guide

- 3 -

P1250 Revision X6 7-8-2011

 

Image 5
Contents VS-GSWG Table of Contents Safety Information and Warnings Pre-installation InformationDC Control and Accessory Wiring Wiring SpecificationsAC Power Wiring Mounting Specifications Mounting Pad InstallationGate Preparation Vent Plug Installation Gate Arm InstallationGate Arm Assembly Operator PreparationController Access Operator SetupAC Power Connection Earth GroundLimit Nuts Rough Adjustment Open and Close Limit AdjustmentLimit Nuts Fine Adjustment Setting Speeds using LSO-2 & LSC-2Loosen the set screw on the adjustment nut Torque Limiter AdjustmentButtons Controller FeaturesApex Function Display Indications Indicator DescriptionsTerminal Group Function Terminal DescriptionsOperator Accessory Connections Operator Accessory ConnectionsBasic Controller Programming Maximum Close Direction Current Setting Run Alarm and Pre-start AlarmMaximum Open Direction Current Setting Advanced Controller Programming Reverse Delay Time Auxiliary Relay ModeBrake Delay Time Constant Pressure ModeMaintenance Alert Trigger Reset Cycle CountAnti-tailgate Enable Radio EnableRadio Transmitter Learn Reset Controller to Factory DefaultsRadio Transmitter Delete MGT Obstacle Transmitter LearnLoop Layout Illustration Safety Edge Layout Illustration Photoeye Installation Illustration Optional In-Cabinet Heater Dual Gate InstallationsOpen and Close Limit settings Operation Indications Gate OperationEntrapment Error IndicationsComm Link Connection Failure MGT Obstacle Transmitter TroubleTroubleshooting Month Preventative Maintenance Preventative MaintenanceFCC Notice GeneralModel VS-GSWG Exploded View Model SWG Mechanical Parts List Variable Speed Control Box Assemblies Controller Parts ListProgramming the Hitachi Inverter Variable Speed Drive ProgrammingShown for Clarity only not Included in ARM Assembly Gate Arm Assembly Parts ListThis page left blank intentionally Gate Operator Installation Checklist