Linear VS-GSWG manual Operator Preparation, Gate Arm Installation, Vent Plug Installation

Page 6

Operator Preparation

Vent Plug Installation

In order to keep gear oil from spilling out during shipping, gear reducers used in gate operators have either a solid plug, or a sealed vent plug, installed at the factory.

For operators with a solid plug, replace the solid plug with the vent plug provided (see Figure 3).

With the vent plug installed, remove the vent plug’s breather pin to allow the gear box to vent (see Figure 3).

Gate Arm Installation

The gate arm connects the operator to the gate. The arm supplied can be used in left-hand or right-hand installations.

Gate Arm Assembly

Refer to Figure 4.

1.Remove the arm assembly cover.

2.Place the center hole in the rail guide over the 1” drive shaft.

3.Place the drive sprocket on drive shaft. Be sure the keyway is in place and set screws are secured.

4.Connect the gate bracket to the gate. Manually open the gate to approximately half-open position.

5.String the arm assembly chain as shown in Figure 4.

NOTE: Observe the way the chain threads around the sprockets for left-hand or right-hand installations. Refer to Figure 4.

6.Adjust for taut chain tension but do not overtighten.

7.Replace the arm assembly cover.

GEAR

REDUCER

REMOVE THE

SOLID PLUG

WITH AN ALLEN

WRENCH

INSTALL THE VENT PLUG

(IF NOT ALREADY INSTALLED)

REMOVE THE

BREATHER PIN

Figure 3. Vent Plug Installation

Figure 4. Gate Arm Assembly

VS-GSWG Swing Gate Operator Installation Guide

- 4 -

P1250 Revision X6 7-8-2011

 

Image 6
Contents VS-GSWG Table of Contents Pre-installation Information Safety Information and WarningsWiring Specifications AC Power WiringDC Control and Accessory Wiring Mounting Pad Installation Gate PreparationMounting Specifications Gate Arm Assembly Gate Arm InstallationVent Plug Installation Operator PreparationAC Power Connection Operator SetupController Access Earth GroundLimit Nuts Fine Adjustment Open and Close Limit AdjustmentLimit Nuts Rough Adjustment Setting Speeds using LSO-2 & LSC-2Torque Limiter Adjustment Loosen the set screw on the adjustment nutController Features ButtonsIndicator Descriptions Apex Function Display IndicationsTerminal Descriptions Terminal Group FunctionOperator Accessory Connections Operator Accessory ConnectionsBasic Controller Programming Run Alarm and Pre-start Alarm Maximum Open Direction Current SettingMaximum Close Direction Current Setting Advanced Controller Programming Brake Delay Time Auxiliary Relay ModeReverse Delay Time Constant Pressure ModeAnti-tailgate Enable Reset Cycle CountMaintenance Alert Trigger Radio EnableRadio Transmitter Delete Reset Controller to Factory DefaultsRadio Transmitter Learn MGT Obstacle Transmitter LearnLoop Layout Illustration Safety Edge Layout Illustration Photoeye Installation Illustration Dual Gate Installations Open and Close Limit settingsOptional In-Cabinet Heater Gate Operation Operation IndicationsComm Link Connection Failure Error IndicationsEntrapment MGT Obstacle Transmitter TroubleTroubleshooting FCC Notice Preventative MaintenanceMonth Preventative Maintenance GeneralModel VS-GSWG Exploded View Model SWG Mechanical Parts List Controller Parts List Variable Speed Control Box AssembliesVariable Speed Drive Programming Programming the Hitachi InverterGate Arm Assembly Parts List Shown for Clarity only not Included in ARM AssemblyThis page left blank intentionally Gate Operator Installation Checklist