
1
2
3
4
Step 9.
Verify the following tools are included in the hardware kit :
Item | Description | QTY |
1 | Hex (Allen) key, 1/4” | 1 |
|
|
|
2 | Hex (Allen) key, 5/32” | 1 |
|
|
|
3 | Screwdriver | 1 |
4 | Screwdriver, Phillips, #2 | 1 |
|
|
|
Step 11.
Remove the packaging materials from the frame assembly with motor shroud.
6
7
6
1 |
| 2 |
|
|
| 4 |
| 5 |
|
| 3 |
|
| ||||
|
|
|
|
|
|
|
|
|
Step 10.
Verify hardware included in the hardware kit:
Item | Description | QTY |
1 | Screw | 2 |
2 | Screw | 12 |
|
|
|
3 | Screw | 5 |
4 | Screw | 7 |
5 | Screw M4x.7, 19mm, Pan Head, | 16 |
6 | Washer, Flat, 5/16” I.D. x 1.2” O.D. | 16 |
7 | Washer, Split Lock, 5/16” | 16 |
Step 12.
With a helper, lift the treadmill frame assembly from the shipping crate platform and place it in the location where it will be used. Make sure the unit is placed near a power outlet.
Caution: The motor shroud end of the frame assem- bly is very heavy. It may require two people to lift this end when moving the frame assembly.