ParaBody 425 manual

Page 18

Step1 7

A.Assemble three 2 IN. PULLEYS (43) to the L-HOOKS on the TOP BOOM(5), us shown, and SECURE piece with two 1/4 IN. CAP NUTS (87).

Step1 8

A. SECURELYassemble the BEARING HOUSING(18) and the CENTER PULLEY BRACKET(10) fo the FRONT UPRIGHT (22) as shown oq drawing, using

two 1,/2 X 3-1/2 IN. BOLTS (68) , four 1/2 IN. WASHERS(63), and two 1/2 IN. LOCK NUTS (90).

(THE CONNECTORPLATES ON THE BEARING HOUSING AND THE CENTER PULLEY BRACKETHAVE SLOTTEr) HOLES, SHIFT THE BEARING HOUSING DOWNAND THE CENTER PULLEY BRACKET UP AS FAR AS POSSIBLE)

B. Attach two 1 X t IN. GUIDES(4i5) to the

ANGLE on the BEARING HOUSING (18).

1/2

I

1/2

I

1/2

 

 

 

 

1

~ I

I 2

I

I I

 

 

 

I

Image 18
Contents SeriousSteel Ii/i/I Label WEIGHTSTACK1-25 58 6214401 PIN WeightstackselectorCAP Joint CONNECTOR3/8 WeightplateAssemblyInstructions StepI I Sep Step Sfep Step Step I12 I I12 ~epSiep FROMPAGE12 IMPORTANT!!! Tighten the NUT~ep1 PUSH/PULL Cable Press Adjustmenttube Sfep 1Sep 1 Sfep 1 ~ Page IMPORTANT!! Tighten the NUT Spring PIN Assemblysecurely Assemblysecurely Important !!! Tighten the NUT of the SpringPIN Assemblysecurely Press Back Support to Rotate FreelyCable Guide On Next LAT CA~LE Cable Form a Loop in the Center of the Cable III Extension LAT 3CK ThreadedshaftTOPBO0 M---~ Sep B X 1 IN. Button Head CAP SCREWS78