Sep 4
A.To ~ssemble the PEC DEC CABLE (110), follow the cobble routing diagram on drawing, and use the following steps:
~Assemble each end of the PEC DEC CABLE (110) to the PEC CAMS(9).
*~Drope the CABLE (110) over the ~PULLEYSon the CENTERPULLEY BRACKET(10). (THIS
FORM A LOOP IN THE CENTER OF THE CABLE)
*Position the CABLERETAININO CLIPS (57) in a 45 DEGREEposition over the PULLEYSalqd the CABLES, and ~ighten the two PULLEY connections SECURELY.
B.To assemble the AB CABLE(111), follow the cable routing diagram on drawing, and use the follow~ng s{eps:
~LOOSELYassemble ~he PULLEY BRACKET(59) fo ~he AB CABLE (111) as shown in drawing using two I/4 IN. WASHERS(80), one two
~Make a loop with the PEC CABLE (110) and attach the PULLEY BRACKET(59) to ~he F'EC CABLE (110) using one
(CONTINUED ON NEXT PAGE)
2 | 5 | 6 |
I i , i I I
27